The term derrick comes from Thomas Derrick, a hangman who invented a type of gallows using a movable beam and pulley system during the Elizabethan era. During his lifetime, Derrick executed over 3,000 people, many of them with his modified gallows device, and the supporting framework for his gallows came to be known as a derrick.Well the ones that we are dealing with have to be a bit taller than that. The reason comes from the connection that we have to make from the rig floor down to the bit at the bottom of the hole. Because we are continually pushing the bit deeper into the ground we need to use something that we can keep extending. (From this it also follows that the top guy on the rig got to be known as the tool pusher). At the same time this connecting device has to be able to allow the mud to get down to the jet nozzles on the bit. The logical way of doing this is to have a tube or pipe, into which the drilling bit can be threaded on the lower end. (Which gives rise to the expression oilfield tubulars). Now, by attaching the mud pumps to the upper end of the pipe, we can also get the mud down into the bit. There is usually a special piece of pipe that fits between the bit itself and the main sections of the pipe, and this is called the drill collar. These normally have a thicker wall than normal pipe so that they can add more weight to push the bit into the rock. (see below).
Drill pipe comes in various sizes, depending on the hole that is being drilled, but for the sake of an example we might use a pipe that is 5.5 inches diameter on the outside and 3.25 inches wide on the inside. This would weigh around 14 lb a foot, and is normally used in 30 ft lengths. This length is a standard, and the pipe will have a threaded connection welded to each end, known as the tool joint. One is male and one is female, so that additional lengths of pipe may be threaded into the original piece to extend the overall length as the hole gets deeper.

To handle these lengths of pipe, and to have them already in place and vertical before we need them, we need a handling system that can lift the pipes into place, and this tall initial support structure is called the mast. Typical modern masts may be around 140 ft tall, with the space between the legs around 12 ft. So to follow through the parts I’ll make a simple version of a mast, and then as I explain what the parts are, I can add them to the model.

I mention the length because there are several things that control the rate of penetration (ROP) of the bit, and one is the thrust that is applied to push the bit into the rock. This comes from the weight of the pipe that is connected to the bit, and thus is known as the weight on bit. However, if you do the arithmetic, 14 x 30 = 420 lb. per length of drill pipe. So if we have one length of pipe we are pushing the bit into the ground with 420 lbs of weight. Add another length and we are up to 840 lb. And so it continues, except that there is, for each bit and rock, a bit weight that will cause that bit to drill at its best ROP Typically this might be around 15 - 20,000 lb depending on hole size and rock type. But we get that weight from the pipe with only 36 lengths, or a total of around 1,000 ft of drill pipe. But increasingly we might be drilling a well that is much more than 7,000 ft deep. (It is actually a bit shorter, since for the first few hundred feet the additional weight of the drill collars is needed to keep the thrust up).
To keep the bit weight at the best level to give the fastest ROP, the driller will carry the rest of the weight of the pipe through the derrick and will adjust the weight on bit by controlling the amount of lift through a block and tackle arrangement to a traveling block on the top of the drill pipe. So to the model we will add a platform at the top, (or crown) of the derrick which will have a pulley on it to feed cable down to the travelling block.

The cable that connects the traveling block to this second crown block at the top makes a number of loops between the two blocks and in this way the cable can carry up to a million pounds or more of weight.

From the crown block the cable feeds back down to the reel on the rig floor where it is stored. The reel and the motors that drive it are known as the drawworks, and the driller controls the reel rotation and thus the weight carried through the cable to the derrick, to control the amount of thrust on the bit.

There are two other things, however, that have to be controlled. Firstly the bit has to turn, and so there must be a way of allowing the pipe to rotate. This is done by adding a swivel below the traveling block. The swivel also allows a connection to the mud system and mud can be pumped into the pipe, without the mud line having to turn.

This is done through a rotary table that sits on the rig floor and a special piece of pipe (some 43 ft long), known as the Kelly, that is connected between the swivel which sits right under the traveling block, and the first length of drill pipe . The pipe is square or hexagonal and will slide through the turntable as the hole gets deeper. At the same time the shape allows the turntable to grip it and turn it, and the attached drill string that connects below it to the drilling bit at the bottom of the hole. There is a motor, generally under the rig, that drives the turntable.

Some more modern rigs can have an electric motor at the top of the mast, attached to the bottom of the traveling block, which drives the pipe without the need for the Kelly and rotary table.

Bear in mind that after the drill bit has penetrated 30 ft (the length of a single length or joint of drill pipe) then drilling must stop. The Kelly is disconnected from the top joint, and raised while a new joint is swung in up the catwalk (from where spare joints are stored on the rig) and connected, at the bottom end to the existing string, and at the top end to the Kelly.
The drill is then ready to go forward again. While I am not up on current performance, I was once taught that a good crew cannot make more than 7 connections, or drill more than 200 ft of hole an hour. (There is another way of adding pipe that can allow a faster ROP but we’ll get to that another time). Now also remember that if the bit needs to be changed because it wore out, or because it can't drill in the rock that it has not started to go through, then the entire string above the bit has to be removed, one joint at a time, until the bit reaches the surface. Then it is replaced, and the joint in turn have to be replaced, again one-at-a-time, until the bit hits bottom again. Now hauling the string out of the hole goes a little faster than drilling, but you can see that this process, known as tripping, can take more than a day. Which can be quite expensive, especially since, while you are tripping you are not making hole, and that is what the rig is being rented to do.
When tripping the well, the drill pipe has to be held in place with slips, which are a wedge shaped tool that fits around the top of the pipe and grips it, while the connections are made or unmade.

Well this is a bit of a hard subject to cover in less than 50 minutes, and without 60 pictures, so if there are things that are not clear, or if some of my numbers aren't quite up to date please comment or ask.
How does the Kelly connect and disconnect to the top drilling pipe? I'm just trying to imagine the force involved in unscrewing it after 30 ft of drilling if it uses the threaded connection.
ReplyDeleteOn reflection, the force must be similar to what's needed to separate the tubulars as the string is tripped. How do they do that?
ReplyDeleteThere is a video on Youtube of them making a connection on a pipe in Canada.
ReplyDeleteIt shows the process pretty well, note that in the first picture the threads are tapered a little to make it easer to insert the pipe and get them started.
hot girl | hot girl | cute girl | girl xinh | funny |
ReplyDeletetravel vietnam | visit vietnam | funny picture | funny picture
socks proxy | socks5 | proxy | proxy free
socks5 | socks proxy | proxy free | proxy
ReplyDeletesocks proxy | socks5 | proxy | proxy free
dich vu lam bao cao tai chinh tai my dinh
ReplyDeletedich vu lam bao cao tai chinh tai hai ba trung
dich vu lam bao cao tai chinh tai ba dinh
dich vu lam bao cao tai chinh tai thanh tri
dich vu lam bao cao tai chinh tai hoang mai
dich vu lam bao cao tai chinh tai tay ho
dich vu lam bao cao tai chinh tai dong da
==========
dich vu ke toan thue tai dong da
dich vu ke toan thue tai tay ho
dich vu ke toan thue tai bac ninh
dich vu ke toan thue tai hai ba trung
dich vu ke toan thue tai tu liem
dich vu ke toan thue tai hoang mai
dich vu ke toan thue tai ba dinh
dich vu ke toan thue tai thanh tri
dich vu ke toan thue tai thai binh
cong ty dich vu ke toan tai vinh phuc
cong ty dich vu ke toan tai hung yen
cong ty dich vu ke toan tai phu tho
cong ty dich vu ke toan tai hai duong
cong ty dich vu ke toan tai hai phong
cong ty dich vu ke toan tai bac ninh
dich vu ke toan thue tai vinh phuc
dich vu ke toan thue tai hung yen
dich vu ke toan thue tai hai duong
dich vu ke toan tai tay ho
ReplyDeletedich vu ke toan tai ba đinh
dich vu ke toan tai hoang mai
dich vu ke toan tai thanh tri
dich vu ke toan tai dong da
dich vu ke toan tai tu liem
dich vu ke toan tai ha dong
dich vu ke toan tai long bien
dich vu ke toan tai thanh xuan
dich vu ke toan tai hai phong
dich vu ke toan tai bac ninh
dich vu ke toan tai hai ba trung
dich vu ke toan tai dong anh
dich vu ke toan tai gia lam
dich vu ke toan tai ung hoa
dich vu ke toan tai quoc oai
dich vu ke toan tai son tay
dich vu ke toan tai thanh oai
hoc ke toan tong hop
dich vu ke toan thue tron goi
dich vu bao cao tai chinh
dia chi hoc ke toan tong hop
khoa hoc ke toan tong hop
hoc chung chi ke toan
dich vu ke toan thue tai tphcm
lớp học kế toán tổng hợp
lớp học kế toán thực hành
dia chi hoc ke toan tai cau giay
ReplyDeletedia chi hoc ke toan tai ha dong
dia chi hoc ke toan tai bac ninh
trung tam dao tao ke toan tai ha dong
trung tam dao tao ke toan tai cầu giấy
trung tam dao tao ke toan tai thanh xuan
trung tam dao tao ke toan tai tphcm
khóa học kế toán tổng hợp tại hải phòng
khóa học kế toán tổng hợp tại tại bắc ninh
khóa học kế toán tổng hợp tại tphcm
khóa học kế toán tổng hợp tại hà nội
trung tam dao tao ke toan tai quan 3
trung tam dao tao ke toan tai binh duong
trung tam dao tao ke toan tai bac ninh
trung tam dao tao ke toan tai hai phong
dịch vụ kế toán thuế tại quận 12
ReplyDeletedịch vụ kế toán thuế tại quận 11
dịch vụ kế toán thuế tại quận 10
dịch vụ kế toán thuế tại quận 9
dịch vụ kế toán thuế tại quận 8
dịch vụ kế toán thuế tại quận 7
dịch vụ kế toán thuế tại quận 6
dịch vụ kế toán thuế tại quận 5
dịch vụ kế toán thuế tại quận 4
dịch vụ kế toán thuế tại quận 3
dịch vụ kế toán thuế tại quận 2
dịch vụ kế toán thuế tại quận 1
dịch vụ kế toán thuế tại quận tân phú
dịch vụ kế toán thuế tại quận bình tân
dịch vụ kế toán thuế tại quận phú nhuận
dịch vụ kế toán thuế tại quận tân bình
dịch vụ kế toán thuế tại quận gò vấp
dịch vụ kế toán thuế tại quận thủ đức
dịch vụ kế toán thuế tại quận bình thạnh
dịch vụ kế toán thuế tại huyện cần giờ
dịch vụ kế toán thuế tại huyện nhà bè
dịch vụ kế toán thuế tại huyện bình chánh
dịch vụ kế toán thuế tại huyện hóc môn
dịch vụ kế toán thuế tại huyện củ chi
dịch vụ kế toán thuế tại huyện cần giờ
dịch vụ kê khai làm báo cáo thuế hàng tháng
ReplyDeletedịch vụ kế toán thuế trọn gói chuyên nghiệp giá rẻ
dịch vụ kế toán trọn gói chuyên nghiệp giá rẻ
dịch vụ rà soát dọn dẹp sổ sách kế toán chuyên nghiệp giá rẻ
dịch vụ quyết toán thuế chuyên nghiệp giá rẻ
Lớp học kế toán tổng hợp thực hành tại hải phòng
Lớp học kế toán tổng hợp thực hành tại biên hòa đồng nai
Lớp học kế toán tổng hợp thực hành tại vinh nghệ an
Lớp học kế toán tổng hợp thực hành tại hải dương
Lớp học kế toán tổng hợp thực hành tại ninh bình
Lớp học kế toán tổng hợp thực hành tại hưng yên
Lớp học kế toán tổng hợp thực hành tại phú thọ
Lớp học kế toán tổng hợp thực hành tại hà nam
Lớp học kế toán tổng hợp thực hành tại vĩnh phúc
Lớp học kế toán tổng hợp thực hành tại bắc giang
Lớp học kế toán tổng hợp thực hành tại thái nguyên
Lớp học kế toán tổng hợp thực hành tại thái bình
Lớp học kế toán tổng hợp thực hành tại nam định
Lớp học kế toán tổng hợp thực hành tại thanh hóa
Lớp học kế toán tổng hợp thực hành tại tphcm
Lớp học kế toán tổng hợp thực hành tại bắc ninh
Lớp học kế toán tổng hợp thực hành tại hà đông
Lớp học kế toán tổng hợp thực hành tại long biên
Lớp học kế toán tổng hợp thực hành tại thanh xuân
Lớp học kế toán tổng hợp thực hành tại cầu giấy
khóa học kế toán toán dành cho giám đốc và nhà quản lý
Dịch vụ kế toán ACB chuyên cung cấp dich vu ke toan trọn gói uy tín chuyên nghiêp giá rẻ nhất tại HCM và các tỉnh lân cận với chi phí bỏ ra chỉ từ 500.000-1.500.000đ.
ReplyDeleteTri ân khách hàng, ACB giảm giá lên đến 50% giá trị hợp đồng khi doanh nghiệp trở thành đối tác của chúng tôi.
Liên hệ: Dịch vụ kế toán , Dich vu ke toan .
Lầu 4, Tòa nhà Long Mã, 602 Cộng Hòa,P.13,Q.Tân Bình,HCM.
Hotline: (08) 62 97 97 97 - 0966 660 888.