Sunday, January 31, 2010

The THAI process for bitumen and heavy oil

For a while, when I was a student, I had an attic bedroom that was heated by a small coal fire, with a relatively short chimney up to the roof. I learned, fairly early on, that in starting the fire you needed a fairly high velocity air flow across the coals, and underlying firewood strips. And to get this I would rest a shovel over the front of the fireplace, and try and seal off the sides. I kept a small bellows beside the fire to help when this wasn’t particularly successful. When you are starting a fire underground the provision of air is critical, but when you are trying to burn the residual coke that is left, after the heat has cracked the rest of the oil and caused it to flow away, keeping that air flowing at a high enough rate to sustain the high-temperature burn becomes somewhat critical to most efficient operation, particularly if the air has to get through a sand layer to reach the fire.

This is the post on THAI – Toe to Heel Air Injection for the recovery of heavy oils, which is part of the ongoing technical post series that I write on Sundays. It is a subject that has been described several times in the past at The Oil Drum. I first mentioned it back in 2006 when the first underground test was underway at White Sands. I used this illustration at the time.

It is an artist’s impression of a side view of the site, with the blue dotted horizontal line representing the recovery well and air being fed in from a higher well into the formation. The test at White Sands in Alberta has been followed by a test at Lloydminster in Saskatchewan which got underway in a more conventional heavy oil last October.

The Kerrobert project followed much on the procedures from the earlier test, and the currently planned full scale production at May River (Large pdf file)
Petrobank, which is partnered with Baytex Energy Trust on the 50/50 joint venture, recently sunk two vertical air-injection wells and two horizontal production wells into the extensive Mannville conventional oil reservoir near Kerrobert.

Compressed air was added last week after a temporary steaming of the ground to mobilize the oil around the injector site. With the addition of the air, spontaneous underground combustion has begun.

"I think we will see some oil as early as today," Bloomer said.
Don and Gail described the THAI process in 2007 and have given some history on its use, THAI having been patented by Petrobank who have a 12 minute video on the process and the first trial and preparation for full scale production. It is well worth watching.

Dave Murphy had an update on the EROI costs in March of last year.
While watching the video is the best way to understand the process, it can also be illustrated with a picture from the plan for May River and I will lift some parts of that document to describe what is planned for that site.

Illustration of the key parts of the process.

The horizontal wells are drilled (a suite of eighteen wells, each with a 2,000 ft horizontal section, spaced 410 ft apart) some 7 ft above the bottom of the formation (or the water table if that becomes an issue). Above these the air injection wells are drilled directionally and offset from the toe of the well. (By using directional drilling air injection can be better controlled than with the original vertical wells).

Layout of the air injection (upper) and production wells.

Once the wells are in position steam will be injected and circulated for a period of 3 months to bring the sand and bitumen up to around 100 deg C, then air will be injected to start combustion. The part of the bitumen that burns as the process develops is the residual asphaltene that is left after the lighter fractions are either evaporated, flow away at reduced viscocity or are cracked by the high temperature (> 400 deg C). The residual material, apparently about 10% of the OOIP, provides the fuel, driving some 90% of the fuel into the production well.

To sustain production after ignition and flame front stabilization has occurred, the wells will carry some 4.4 million cf/day into the formation, and about the same amount of a mix of carbon monoxide, carbon dioxide, and hydrocarbon gas will be released. As the video notes that gas will be used on site to generate electricity to run the air compressors, and to provide site power. Based on the earlier tests the site is anticipated to generate some 10,000 bd of cracked bitumen, and about twice that in water production. The flame front will move forward at between 5 and 10 inches a day. The oil is projected to be a significant upgrade of the original bitumen. The water has the potential for being sold to other operators in the area for use in SAGD production.

Comparison of bitumen with THAI produced oil.

The energy efficiency of the site is anticipated to be 85.7%. It should be noted that the document I have taken this information from also contains a conservation and reclamation plan. (But at 653 pages long for the whole document I have only noted key passages for the theme of the post).

In response to my SAGD post both Rockman and RockyMtnGuy commented about using underground combustion to help with getting the bitumen from the oil sand.

One of the things that they were concerned about, as was I, is the control of the flame front which becomes more difficult as the height of the production zone is around 70 ft. However at May River they plan on burning from the outside in, so this may control the extent to which the fire overburns. In addition, as I noted at the beginning of the post, it is rather difficult sometimes to sustain the right temperatures without a high flow of air, and that may provide a further control.

The conditions are somewhat different at Kerrobert where the oil is less viscous and the formation is around 100 ft thick. This has caused some problems since the well flows exceeded what had been anticipated:
the original plan was to use temporary hydraulic pumps on each well to create a drawdown pressure across the horizontal well and, as combustion gas production increased, pumping would cease and wells would flow by produced gas lift.

Initial fluid production volumes were tested at 180 to 300 barrels per day per well, with oil cuts ranging from zero to 40%. However, during the transition phase to gas lift it was learned that liquid inflow to the production wells exceeded the pump's capacity, which limited the ability to draw down the wells and caused frequent pump failures. On Dec. 21, the pump in KP1 was re-configured to improve its pumping capacity. Now KP2 is being re-configured and is expected to be producing at similar rates to KP1 within the next few days.

Since the re-configuration, fluid production rates from KP1 have ranged between 250 and 420 bbls per day with oil cuts averaging 36% and reaching as high as 65%. Also, the air injection rate was increased to 50,000 cubic metres per day and the produced gas rate has increased to 8,000 cubic metres per day.
Looks as though things are going quite well.

Oh, and the disadvantage of having a small coal fire in a garret flat is that during the night it went out, and in the morning I would occasionally wake up with snow in the grate.

12 comments:

  1. Thanks for these posts, Nate. I have read every one.

    "the document I have taken this information from also contains a conservation and reclamation plan. (But at 653 pages long for the whole document"

    Where can I find this document?

    Also wonder why they don't circulate cold water through the edge of the production zone. Slip a removable waterproof liner into the last horizontal to cool things off and prevent ignition and then when it is time for the production zone to move, take out the liner and voila- the cooling well is a production well.

    Thanks
    Jim Adams

    ReplyDelete
    Replies
    1. AVAILABLE PETROLEUM PRODUCTS ON FOB CI DIP AND PAY, CIF AND TTM PROCEDURE

      WE HAVE AVAILABLE PETROLEUM PRODUCTS FROM RELIABLE REFINERY IN RUSSIAN FEDERATION WITH BEST PRICE AND QUALITY.
      BELOW PRODUCT ARE AVAILABLE WITH BEST OFFERS - FOB CI DIP AND PAY FOB PRODUCTS AVAILABLE

      JP54: Quantity: 500,000-2,000,000 Barrels
      JetA1: Quantity: 500,000-2,000,000 Barrels
      D2: Quantity: 50,000-150,000 Metric Tons
      D6 Virgin: Quantity: 400,000,000-800,000,000 Gallon

      SERIOUS BUYERS PLEASE CONTACT US FOR MORE DETAILS WITH YOUR SPECIFIC REQUIREMENTS SO AS TO ENABLE US PROVIDE YOU WITH OUR WORKABLE

      PROCEDURE.
      Sincerely.

      Maksim Yaroslav (Mr.)
      EMAIL: neftegazconsultant@yandex.ru
      EMAIL: neftegazconsultant@mail.ru
      Skype: neftegazconsultant
      TEL: +7 9265036551

      Delete
  2. The whole document can be found by clicking on the May River phrase that is highlighted in the second paragraph after the first figure. Or alternately go to
    http://www.petrobank.com/wp-content/uploads/2010/01/Petrobank_Round1_SIR.pdf

    The file is about 65 mag in size.

    ReplyDelete
  3. Have been to their sight counntless times and I miss the best thing!
    Thanks tons,
    Jim

    ReplyDelete
  4. We Can supply Aviation Kerosene,Jet fuel (JP 54-A1,5), Diesel (Gas Oil) and Fuel Oil D2, D6,ETC in FOB/Rotterdam only, serious buyer should contact or if you have serious buyers my seller is ready to close this deal fast contact us below:now base email us (neftegazagent@yandex.ru)

    PRODUCT AVAILABLE IN ROTTERDAM/ CI DIP AND PAY IN SELLER EX-SHORE TANK.

    Russia D2 50,000-150,000 Metric Tons FOB Rotterdam Port.

    JP54 5000,000 Barrels per Month FOB Rotterdam.

    JA1 Jet Fuel 10,000,000 Barrels FOB Rotterdam.

    D6 Virgin Fuel Oil 800,000,000 Gallon FOB Rotterdam.

    E-mail: neftegazagent@yandex.ru
    E: neftegazagent@mail.ru
    E: neftegazagent@yahoo.com

    Best Regards
    (Mr.) Vladislav Yakov
    Skype: neftegazagent

    Thank You

    ReplyDelete
  5. I am a Brooker to a Direct Mandate working with a reputable refinery, and we are please to inform you esteem buyers that the petroleum products you are looking for is available in our Tanks and reservoir for immedaite lift and supply.

    SUCH AS
    1) JP54
    2) JPA1
    3) MAZUT
    4) AGO
    5) LNG
    6) LPG
    7) D2
    8) D6
    9) REBCO
    10)EN590

    Please contact us via our official email address.

    pavelalek_ivanovich@mail.ru +79260030732

    Thanks.

    Pavel Alek Ivanovich

    ReplyDelete
  6. Corporate profits include the profits of the Fed turned over to the US Treasury. This amount is now about $100B/year. The NIPA treat the Fed as if it were a private firm, when in fact it is a nationalised firm subject to a 100% corporate income tax rate.toronto real estate listings

    ReplyDelete
  7. We are the independent publication delivering news around cryptocurrency news, ICO news & Latest Blockchain news. Our platform focuses on providing news around blockchain, cryptocurrencies, distributed systems and decentralized global economy. We regularly keeps its readers updated on Bitcoin news, Ethereum news & Altcoin news. For all crypto enthusiasts, Coinpublish is the place to be.

    We make great efforts in contributing to gather unbiased and reliable information for our dedicated and influential readers across the globe. All updated information regarding price change, developments and technological advancements in cryptoverse are available on Coinpublish. Our platform allows marketers to promote latest news in the form of Press releases & Advertisements.

    Our mission is to enlighten the world about the pros and cons of cryptocurrency and blockchain. When we decided to start Coinpublish, we were in a race with strong competitors. We had to be better and different. For this, we chose to roll the dice to come up with unique ideas in order to make the platform user-friendly and informative.

    To know more about coinpublish visit the given link - www.coinpublish.com/

    Connect to Coinpublish through given links:
    Facebook - https://www.facebook.com/coinpublishdaily/
    Twitter -twitter.com/Coin_Publish
    Linkedin - in.linkedin.com/company/coinpublish

    ReplyDelete
  8. This comment has been removed by the author.

    ReplyDelete


  9. Dear Sir/Madam,

    We are direct end seller refinery company for the supply of Petroleum products. Currently we are allocating our products on discount platts to capable buyers, we have available Jet fuel, D2 Gas oil, D6, EN590, JETA1, for capable buyer lift in Houston and Rotterdam commercial sea ports and also on CIF basis to any safe world port. Kindly Contact us via: jsc.uraloil@bk.ru for SCO.


    Kind Regards.
    Dr. Khaibullin Timur Tagirovich   
    Email: jsc.uraloil@bk.ru
    Skype: jsc.uraloil@bk.ru

    ReplyDelete
  10. We Neftegaz Energy Consultant, Currently working as a mandate to a Russia Refinery who has following Petroleum products in Rotterdam and Russia for urgent lift.
    We have JP54, D6, D2, A1. on CI Dip and Pay. 
    If you interested contact us for SCO.

    Maksim Yaroslav
    Email: neftegazconsultant@yandex.ru
    Email: neftegazconsultant@mail.ru
    Skype: neftegazconsultant

    ReplyDelete
  11. Good Day,

    Are you looking for Storage Tanks In Rotterdam? Houston? Then worry no more SOVREDMET LOGISTIC COMPANY got you covered. Contact us Now on email address: ackermanbarnhardt@gmail.com

    SOVREDMET LOGISTIC COMPANY are pleased to bring to your notice that we have Tanks available for lease. Our Tank Farm have durable and reliable tanks storage facilities at Rotterdam, and Houston. Our tank farm is a Crude/Petroleum reservoir with high storage capacities located in all ports in Netherlands (Rotterdam). Our Team of competent experts are always interested in giving you one of the best services and total product security guaranteeing your satisfaction and securing our values. Contact us today for our services and have your products in safe custody.

    Please contact us via our official email address: ackermanbarnhardt@gmail.com

    Thank you

    ReplyDelete