Waterjetting 21d - confined coal transport

Collecting the material that a high-pressure waterjet has dislodged from a surface can be carried out in a number of ways, depending on the scale and volumes of material that have to be removed. One of the initial problems that arise depends on the energy of the jets that are striking the target, and the part of that energy that remains in the water and dislodged particles after the jet impact.

If a surface is relatively smooth (think for example of a ship hull, or the deck or sides of a bridge) then when a jet has hit the surface and removed the small amount of material (such as rust or paint) it will likely continue in a relatively straight line forward, since the surface roughness of the target, while disrupting and flattening the jet, has not sufficient angle to radically change much of the flow of the jet.

Which might make it time for a little recap. One of the experiments that I would run with an introductory undergraduate class was to give each student a high-pressure lance, and then have them hold the nozzle just above a target surface. The pressure of the water being fed to the gun was then slowly raised, and as this occurred the jet went from striking the surface and then just flowing along it, when there was no penetration or surface material removal, to being reflected back at the lance holder.

The reason for this is that, as soon as the jet started penetrating into the material (usually a rock for the purpose of the demonstration) then the water is entering a hole where the only exit is back the way that it came in. It is a salutary lesson for the lance holder since all of a sudden the jet is coming straight back (which is why all the personal protective equipment is an important part of the lesson).

This only holds true where the jet is hitting a relatively flat surface in an approximately normal or perpendicular axis of attack. In the more general case the cut along the surface will cause the water and debris to scatter in a more general spread, and it becomes a more difficult job to collect both back together in a way that allows both to be contained and removed from the site (an increasingly important part of the environmental parts of the process).

There are places, such as steeply dipping coal seams, where the geometry of the excavation itself helps to confine this ejecta and direct it, under gravity, to fall into a narrow space where the water and coal particles are brought together so that the coal is suspended in enough water that it can then be carried away from the work zone.

Perhaps the best example of this was the Sparwood mine in British Columbia in Canada, where the mine was extracting coal from a seam that was roughly 40 ft thick, and which dipped at around a forty degree angle.


Figure 1. Section showing the Sparwood mining plan

Drifts were first run at a slight angle (this started at six degrees, but after lining the flume with Teflon plates the mine was able to reduce this to just over four degrees) to the strike of the seam. This was a sufficient angle that, when all the coal was caught in the flume it would be carried down without settling by the spent water from the mining process, which was also trapped in the underlying drift, and held by a barrier across that drift. The shallower the angle then the more coal could be recovered above the main haulage ways at the back of the working area.

The mining tunnels (drifts) were first driven to the back of the section, using a small road heading machine to extract the coal, while installing a flume along the side of the drift so that the coal could be immediately transported away as it was mined. Full support to the tunnel was also installed using arch girders, with bracing wooden slats between the girders. Once the drift had reached the end of the seam, then a hydraulic monitor was placed in the uppermost drift, and the arch girders and wooden planks removed from the final fifty feet of the tunnel, with the monitor placed under the last few tunnel supports of the remaining tunnel section.


Figure 2. Layour of the monitor within the access drift.

By using a jet of just over an inch in diameter. the jet was able to reach the back of the section of coal that had been exposed when the supports were removed (zone 5 in figure 2) a distance of over 120 ft. the monitor was moved by two sets of hydraulic rams, but if you note where the operator is standing at the back of the machine, this is some 40-ft from the opening and the mining operation itself is not visible.


Figure 3. A monitor in operation at Sparwood. Note the short length of the barrel, which would still produce a high-quality jet, since flow straighteners were used in the barrel, placed directly behind the nozzle.

The operator uses the rams to move the nozzle in an oscillatory path, and listens to the sounds of the jet as it strikes the coal. The sound is quite distinctly different when the jet is hitting coal, as opposed to striking roof rock or shooting into the open space of the drift updip. (I was told this, not having that experience, though I have found similar changes in sound useful in other applications that I will discuss from time to time). It takes, apparently, a couple of days for an operator to be able to consistently detect and use the sound differences to be able to effectively mine with the monitor.


Figure 4. Operator at the Sparwood mine, standing at the back of the machine, and beside the flume.

The way in which the coal broke under the jet attack was only controlled by the operator to a limited extent, so that there can be a significant volume of large coal surviving into the lower entry for collection, and flume transport needed a smaller size distribution. For this reason the coal company installed a coal breaker at the entry to the flume so that the water carried the coal lumps through the breaker, and only then did they enter the flume (Figure 4).

At the time that I visited the site the slurry was higher than shown in the above figure, with coal overlying parts of the back of the breaker. To make it easier to operate the breaker, while keeping the operator safe behind the roof supports, a second small monitor was set by the operator which could be used to clear off the machine from time to time.

The machine was operated by two individuals and over the course of ten years averaged a production of over 3,000 tons a shift. It was also for many years, the safest mine in Canada. To put that production in perspective, in those years an average section in the underground mines in Illinois, running a continuous mining machine, might average about 700 tons a shift, and would need about 14 men to achieve that target. (Production rates have since risen considerably as automation and remote control have reduced the number of folk needed, while higher-powered machines now produce greater coal volumes faster.)

Yet the range of seams where this type of mining can succeed is limited, particularly in the United States, and in coal seams that do not dip as steeply it becomes more difficult to control the particle and water spread as it leaves the impact region.

I’ll talk about a specific way that one can, on occasion, change that, in the next post.

Read more!

Tuesday, January 29, 2013

Waterjetting 5c - flow straighteners

One of the advantages that became clear, even in the early days of waterjet use in mining, was that the jets cut into the rock away from the miner. It was thus a safer method of working, since it moved the person away from the zone of immediate risk. Rock has a tendency to fall when the rock under it is removed, and by using the jets to carry out the removal, so the miner is no longer as vulnerable.

But, in the early days of jet use the range of the jet was quite limited. Part of the reason for this is that the water is generally brought to the working place along the floor. It then has to be raised, through bent pipes, to the level of the nozzle, and then turned so that the water in the pipe is flowing in the direction in which the nozzle is pointing.


Figure 1. Sketch of an early Russian waterjet mining monitor

Even though the pressure of the jet is relatively low, the volume flow rates were high, and the bends leading into the nozzle set up considerable turbulence in the jet, so that the range of the jet was quite limited beyond the nozzle. There are a number of different ways of improving the range of the jet, and I will discuss these in later posts, and many of these techniques apply whether the jet is being used at high volume and low pressure for mining, or at higher pressures and lower flow rates for cutting into materials. But today the technique that I will discuss is the use of flow straighteners.

The two most dramatic instances that I immediately recall for their use were at the Sparwood mine in British Columbia, where the collimated jet was able to mine coal up to more than 100 ft. from the nozzle, and in an underground borehole mining application where a Bureau of Mines commissioned system was able to cut a cavity to more than 30 ft. from the nozzle, which was centrally located.

Collimating jets to get better performance is not restricted to the mining industry. A visit to Disney, for example, will find jumping jets that appear to bounce from place to place (video here) (this one shows the start of the surface waves along the jet, known as Taylor instability, which grow and cause the jet to break up; and if you want to make one Zachary Carpenter has two instructional videos on how they are made. (here and here.)

Essentially, as those Youtube segments show, the flow straightness is achieved by dispersing the water – using a sponge – so that it flows through a large number of drinking straws. These straws act to collimate the water flow, and it emerges as a glassy rod, which even acts as a light path so that light shone down it emerges at the far end. This can be used for a variety of different purposes, other than just for entertainment.

This then is the basic idea behind a flow collimator, although for larger mining flows drinking straws are too weak, and the flow volumes need to be larger. There are various designs that have been used for mining applications. Some of the earlier trials were at the Trelewis Drift mine, where the then British National Coal Board set up an experimental operation.


Figure 2. Sketch of Monitor used in the NCB Trials (after Jenkins, R.W., "Hydraulic Mining" The National Coal Board Experimental Installation at Trelewis Drift Mine in the No 3 Area of the South Western Division, M.Sc. Thesis, University of Wales, 1961.)

A number of different designs were used for the flow straighteners that were located at the nozzle end of the straight pipe section leading into the nozzle:


Figure 3. Designs for the initial flow straighteners used at Trelewis Drift (after Jenkins, R.W., "Hydraulic Mining" The National Coal Board Experimental Installation at Trelewis Drift Mine in the No 3 Area of the South Western Division, M.Sc. Thesis, University of Wales, 1961.)

More recent designs, which vary according to pressure, flow rate and pipe diameter, are a combination of those on the left above, and those on the right. It was such a combination that allowed the Canadian miners at Sparwood to achieve production rates of 3,000 tons of coal per shift as an average over the operation of a mining section.

While the use of flow straighteners does not give any gain over having a long straight section of pipe leading into the nozzle, it can bring the flow condition up to that level in places where the geometry (or the resulting unwieldiness of the pipe) would make the long entry impractical.

One of the more interesting applications of this is in the borehole mining of minerals. Simplistically a hole is drilled, from the surface down to the seam of valuable mineral. Then a specially designed pipe is lowered through the hole with the pipe having a nozzle set on the side. Then, as the pipe rotates, and is raised and lowered, the jet mines out the valuable mineral, which flows to the cavity under the pipe, where it is sucked into a jet pump and carried to the surface.


Figure 4. Schematic of a borehole mining operation (George Savanick)

As I mentioned at the top of the article, the jet cut a cavity some 30 ft in radius, with the jet issuing through a nozzle some 0.5 inches in diameter. In order to achieve this range it was important that the jet was properly collimated, yet the nozzle was set so that there could be no straight section.


Figure 5. Section showing the feed into the borehole miner nozzle. Note the vanes in the section leading into the nozzle (George Savanick).

The turning vanes to achieve the flow collimation were designed by Lohn and Brent (4th Jet Cutting Symposium) to produce a jet equivalent to that achieved had the nozzle been attached to a straight feed.


Figure 6. Turning vanes used to achieve a jet capable of cutting coal to 30-ft from the nozzle. (P.D. Lohn and D.A. Brent “Design and Test of an Inlet Nozzle Device” paper D1, 4th Int Symp on Jet Cutting Technology, Canterbury, BHRA 1978)

Tests of the performance of the nozzle showed that it produced a jet that was at least equal in performance to a nozzle with a straight feed, up to a standoff distance of 45 ft.

In simpler applications the designs do not need to be that complicated, for many simple spraying nozzles, for example, the straightener is made up of a simple piece of folded metal.


Figure 7. Simple flow straightener for use in low pressure and flow applications.

The water has now reached the nozzle, but that is not the end of the story of the feed system, as I will start to explain, next time.

Read more!