Showing posts with label crystals. Show all posts
Showing posts with label crystals. Show all posts

Wednesday, June 23, 2010

Deepwater Oil Spill - Problems with the LMRP cap

BP issued a press release this morning that read:
NEW ORLEANS -- This morning at approximately 8:45 a.m. CDT, a discharge of liquids was observed from a diverter valve on the drill ship Discoverer Enterprise,which is on station at the MC252 well-site. As a precautionary measure,the lower marine riser package (LMRP) containment cap system, attached to the Discover Enterprise, has been moved off the Deepwater Horizon's failed blow-out preventer to ensure the safety of operations and allow the unexpected release of liquids to be analyzed.

Capture of oil and gas through the LMRP cap is therefore temporarily suspended until such time that the cap can be re-installed. Capture of oil and gas through the BOP's choke line to the Q4000 vessel on the surface continues.

LMRP cap floating free 4 pm June 23, 2010 (Enterprise ROV2)

UPDATE: The cap was replaced at around 6:30 pm and appears now to be working as before the event. The standings in the Solar Car race have been added to the end of the post.

Unfortunately the severe weather in the area today is not helping the effort either.
.
Due to severe weather conditions expected across southeast Louisiana today, June 23, regularly scheduled cleanup and response efforts may be impacted/halted as weather systems move through the area. These efforts include controlled burns, dispersant flights, and booming operations. Source efforts and some skimming vessels may be operating as long as conditions do not exceed their operating limits. Protective boom is in place along many miles of Louisiana’s coastline. Crews will resume cleanups as soon as safely possible. Safety of all personnel is important to the success of this operation.
At a press briefing in Washington on the event Admiral Allen blamed the event on an ROV hitting one of the valves on the vent at the top of the cap and causing it to close. With the vent closed the pressure under the cap would increase (since the flow would have a smaller area to escape through). That increase in pressure was enough to reverse the flow through one of the lines that send warm water down to the cap to keep it warm enough that hydrates don’t form.

It appears, from Joel Achenbach's Washington Post report that oil and gas was found coming out of a line that was pumping the water down, which raises a little question over the flow circuit being used that would allow that to happen? That discovery led to the cap being removed from the well for inspection. Any gas outlet at the surface would pose increased risk to those running the operation and had to be dealt with immediately.

The current plan is to replace the cap later this afternoon, presuming that the blockage has been removed. Unfortunately, without the pressure gage recordings from inside the cap it is not possible to know if the pressure build-up was gradual, which could be explained by this deposition of material in the flow path, or if it was a step-function which would more likely result if an ROV had nudged a valve closed.

As I mentioned earlier the alternate hypothesis is that there has been some crystal growth within the flow path through the cap, which caused crystals to grow, constricting the channel and thus raising the pressure in the cap itself. The pressure jump cannot have been too rapid if the indication of the problem came from the backup of oil and gas out of a water line. And crystals can form either quickly, in large size, or more slowly and insidiously.

Barium Sulfate Crystals growing in a 3-inch I.D. pipe that carried oil from the deposits under the North Sea. (Scale is in cm) (Growths of this size can occur in less than 24 hours).

That having been said, and recognizing that Occam’s Razor may well cut my hypothetical throat one of these days, the transcript of the press conference is now available. The Admiral clearly blames the ROV for the incident
Out of abundance of caution the Discover Enterprise removed the containment cap with the riser pipe and moved away until they could assess the condition.

They have indicated that the problem was a Remotely Operated Vehicle that had been around the (inaudible) package that bumped into one of those vents that allows the excess oil to come out. They actually closed it thereby creating pressure and the backflow potentially off the water vent.

They are checking the containment cap right now that there are no hydrates in the containment cap. They will attempt to reinstall the containment cap and begin producing later on today. If there are hydrates they will probably have to rerun the pipeline, and that will take a considerable amount longer.
At present it appears that they are lowering the cap back into position. The specific event was described as follows:
My understanding was they noticed there was some kind of a burp in the line where there was either natural gas or some reason. They thought they had product—or hydrocarbons coming up through the water line that's usually meant to carry hot water down, which is to heat the pipe, as you know to do away with the hydrate problem.

When they thought that that line might have been compromised, or they have the chance that they might have hydrocarbons coming up through that vent into the Discover Enterprise, which is flaring right now, over an abundance of caution they elected to remove the cap and move the riser pipe and the cap away.

When they moved it away then it's open to seawater. And they said if there is any product there you have the chance for hydrates to form. So before they decide to move it back in they have to check and see if there are any hydrates there. If there are hydrates they are probably going to have to pull the drill pipe and reinsert it once the hydrates are cleared.

And again, the initial indications were that one of the vents, which is allowing the oil to vent so the cap will stay on will somehow might have been dislodged by coming in contact with our ROV. But I think they are trying to validate that right now. They do know that one of the vents was shut when they set the second ROV down to take a look. That's all we have right now. We're continuing to look into it.

But then there was also this
they found this out after the fact when they set their ROV down after they had removed the containment cap that it appeared that one of the vents had been closed. Now the assumption is that was a result of an ROV bumping into it and actually closing the vent. We don't know that for sure. I think we're still developing the facts associated with it. I don't think it's any problem in putting on an exact timeline when we get all that stuff together.

The Admiral also updated the schedule for drawing oil from the BOP through the kill line. The riser to carry that has been installed, and they are now hoping to have that hooked up to a second vessel by next Tuesday. This will increase the production capacity from the well to 53,000 bd.

Given the concern that has been expressed about hazardous vapors being given off over the clean-up site, the Admiral also brought an OSHA representative to the meeting, and he noted:
We have been taking samples again, of worker chemical exposures. Again, on the beaches, in the swamps, on the boats, everywhere that workers are. And I will just let you know, we can discuss this a little more, that we have found no exposure levels to any chemicals that are of any concern.

The main problem we've been seeing down there, the main concern that we've had for worker health and safety has to do with heat. As you know, people are working in very high heat conditions. Very often they are also working with Tyvek suits with chemical protective suits, gloves, which exacerbates the heat problem.

Finally there was this interesting teaser about the possibility of running the production from the well to an existing platform.
I believe BP is in discussion with other industry producers that have rigs in the area that might be useful for that. I don't think they concluded those yet. I just mentioned it yesterday because I was asked about whether or not there were any redundancies or any recourse if we had a hurricane or heavy weather that allowed us to move—or required us to move all of the vessels from the scene.

This would be one way if you are actually connected to another drill site, you would not have to rely on service vessels.
There is more on what would be involved at Upstreamonline (who asked the question).

The update on the solar car race, with the teams resting in Rolla overnight, and leaving at 9 am in the morning:

1) Michigan . . . . .15:48 (hours and minutes)
2) Minnesota . . .17:06
3) Bochum . . . . . 17:28
4) Calgary . . . . . .19:08
5) Stanford . . . . . 19:23
6) Missouri S&T 19:47
7) Kaohslung . . . 22:01
8) New Paltz . . . 25:27
9) Northwestern 27:43
10) Kentucky 28:05

And as I drove home from work car #5 the entry from Illinois State, rolled past me and on to the finish line.


Read more!

Monday, May 10, 2010

Crystals and the Gulf of Mexico Blowout

The situation in the Gulf, in regard to the Deepwater Horizon fire and oil spill continues to evolve. Since my last post on this, the size of the operation has continued to grow, with some thought now being given to dredging barriers along the coastline. What I thought I cover a little today, among other things, is the problems that occur when oil leaves a hot reservoir and suddenly enters a pipe on the floor of a very cold sea, causing some of the constituent chemicals to crystallize out. To illustrate this, I took a picture of one of the pipes that used to sit in my office, since it helped visualize a problem we had been given, and is along the lines of that now facing BP.

Barium Sulfate Crystals growing in a 3-inch I.D. pipe that carried oil from the deposits under the North Sea. (Scale is in cm) (Growths of this size can occur in less than 24 hours).

You will note that the crystals have reduced the effective diameter of the pipe down to about 1.5 inches, cutting the flow the pipe can carry by 75% (roughly). These are but one example of a number of different chemicals that can precipitate out in the pipes that carry oil from the reservoir, where it hot, up through colder zones as it rises through the different pipes on its way to land. There are two different aspects to the problem that I want to cover since it relates to the formation of methane hydrates in the capture box that BP had fielded at the end of last week.


The first of these is on the growth of the crystal hydrates within the confinement box that BP had lowered over the middle leak in the riser. However, rather than dig back into my notes, I am going to suggest that those who want to understand the chemistry/physics go to The Obligate Scientist. He uses a plot from the USGS to illustrate the conditions that transition methane gas to methane hydrate as a function of temperature and pressure (depth in the ocean).

(Source USGS )

To which, to give it current relevance, the USGS have added what happens at the sea bed, exemplifying this with a seabed at 2 km deep, while in this case it is only about 1.6 km. However the temperature is still sufficiently low to cause the hydrates to form.

(Source USGS )

The temperature of the fluid is critical, as can be seen, but for the temperature to reach that level requires a certain amount of residence time, for heat transfer to take place. Unfortunately in constructing the box the way that BP did, while providing stabilizing plates that would stop the box sinking into the sediment, these also act as heat radiators, ensuring a very rapid heat loss to the surrounding sea and a faster drop in temperature for the gas, accelerating the formation of the hydrates.

As I mentioned above there are two problems that then arise. The first of these is the immediate constriction of the flow path, as the first figure shows, the second is that if the crystals were to break off, or grow freely to that size and then enter the flow channel, then unless they are all smaller than about 30-40% of the flow channel diameter, then they will jam together and block the flow channel. (I have photographs somewhere of a pair of particles, both nominally less than half a tube diameter wedged together in the middle of said tube and effectively blocking it – hence the rule of thumb).

So as the crystals grow they both reduce the flow channel itself, and also increase the risk of total blockage. Now it might be suggested that if the speed of the fluid were increased that this would not give the crystals time enough to form and cause the above problems. These are three, originally similar sized nozzles through which water was fed at 40,000 psi. (It is used in industrial cutting) The top orifice was totally blocked after 48 hours of operation using untreated tap water, the center orifice is largely closed after 104 hours using softened water, and the bottom orifice is still clear after 200 hours using de-ionized water. The water velocity was around 2,400 ft/sec and, as you may note deposits still grew.

After Hashish (Flow Industries)

Keeping deposits from clogging feed lines is thus a tad more complicated than it may first appear. And while I note that BP is now apparently planning on lowering a second smaller cap into position, there may need to be other modifications (such as an inner liner of Teflon to insulate the flow from the radiative metal of the box) that have been added (perhaps an internal heating system) to help alleviate the problem.

The Unified Command Center has noted the following update to the resources mobilized to help with the spill:

Total response vessels: more than 290

Boom deployed: more than 1.1 million feet (regular plus sorbent boom)

Boom available: more than 1.4 million feet (regular plus sorbent boom)

Oily water recovered: approximately 3.6 million gallons

Dispersant used: approximately 372,000 gallons

Dispersant available: approximately 180,000 gallons

Overall personnel responding: approximately 10,000

There was a “real time” transcript of the press conference that BP held at noon (6 pm in the UK) in which they commented that the second dome that they will try to cap the well with is going to be much smaller (about the size of a barrel) and that this should be tried within three days , and if that doesn’t work they are thinking of tapping into the pipe to drain the oil without seawater contamination. One of the problems, apparently has been the high gas content of the oil. Much higher than had been anticipated.

The box is being made smaller so that warm water (from the surface) can be poured over it to keep the temperature above that at which the hydrates form.
Now they've gone from "one extreme to the other". The "top hat" dome is 5ft tall, 4ft wide. Warm sea water will be pumped down. As they lower the dome it will already be operational - hooked up to a ship on the surface. It will be more difficult to place but they will succeed.

It should be in place by the end of the week.

Read more!