Sunday, November 29, 2009

Drilling Rigs and Drilling Ships

The debate about how much oil is left and recoverable in the world has brought increasing attention to the recovery of oil and natural gas from offshore. And while I suspect that most of those who comment on this site are very familiar with all the terms, some of the more general readership may not be. Let me, therefore, explain just a bit about some of the different words that are being used here - with references and videos, where I can find them - to pictures of the different types of structures that are being used. And if I miss some, please chip in either to ask or answer.

Just as on land, we need some form of drilling rig if we are going to drive a bit down through the rock and find us some oil. But, unless we are working somewhere like the North Slope where we can wait until the sea freezes over and drive ice roads out to build islands to drill from, we are going to have to find a different way of providing the infrastructure support for that bit. And here is the first distinction - because a drilling rig, in the offshore sense, is more of an exploratory tool, going out to find oil, rather that developing the known fields and bringing in production. That latter task is left more to production platforms, which can be sited where best to drain the field, and may not even use the initial holes drilled by the exploration rig.

As you may have read the Minerals Management Service keeps track of production offshore (as well as on Indian lands) and lest you think that it is not that significant a bunch of folks, they have just handed out $10.68 billion in 2009.

Of the $10.68 billion, $1.99 billion was disbursed directly to states and eligible political subdivisions such as counties and parishes. Another $5.74 billion was disbursed to the U.S. Treasury; $449 million was disbursed to 34 American Indian Tribes and 30,000 individual American Indian mineral owners; $1.45 billion was contributed to the Reclamation Fund for water projects; and $899 million went to the Land & Water Conservation Fund, along with $150 million to the Historic Preservation Fund.
As with many departments of the Administration the MMS is focusing on
the importance of renewable energy and job creation, climate impact and adaptation, and efforts to support and maintain the treasured landscapes of America in the emerging clean energy economy.
Since it also controls (for the Secretary of the Interior) lease sales – with a large upcoming one in the Gulf it is a good site to check on periodically. Now to get back to what we’re going to do to get the oil/gas out if we are fortunate enough to get one of those leases.

In really shallow water, or the bayous, you might launch your bit from a drilling barge, where the derrick can be assembled once the barge has been towed to the right place. Barges can be flooded to rest on the seabed in relatively shallow operations.

Drilling barge

However they are very susceptible to bad weather, and last April one had to be raised after being sunk during Hurricane Gustav.

Raising a sunken drilling barge

So, as one moves further offshore, then one might use a self-erecting tender from a barge, but would more likely move to something which could get the drilling floor stabilized and up above the waves. These are the jack-up rigs.

Model of a jack-up rock (Stavanger Oil Museum)

Typically they have three legs, that are raised as the rig moves around. Then when it has reached the desired site, the legs are lowered to rest on the sea floor and the entire structure jacks itself up out of the sea, and, hopefully, above the waves. (You can get a paper model to cut out and assemble for this rig). There is also an animated video showing the installation of a rig at a site.

They can do this to work in depths to around 500 ft. The discussion about damaged rigs gave links to the different rigs that have been damaged, and some of these have photos of the rigs in better days.

As one goes out to deeper depths, then one will look for a more substantial vessel and so one comes to the Semi-submersible.

Semi-submersible drilling rig (Stavenger Oil Museum)

These are built to either sail themselves, or to be towed out to the site, with the assembly floating, and then fluid is pumped into the bottom tanks to partially submerge the vessel and thus stabilize it. One can get some idea of the size of these from some of the photos shown where, (thanks to Ed Ames), wikipedia covers the subject.

Semi-submersible rig off Brazil (Wikipedia)

Since these are floating there has to be a way of holding them in place. One way is to have them dynamically positioned, using thrusters to hold them in position, such as these.

Thrusters that go under the pontoons to stabilize a semi-submersible (Wartsila)

Note that it takes about 3 years to build such a unit. The alternative is to have the rig attached to anchors on the sea bed using cables, or tethers. (And for those interested in natural gas production, note that the same rigs are used for both).

Cables with controlled winches to stabilize a semi-submersible rig (Stavanger Oil Museum)

The connection between the well and the platform now becomes more flexible and special connecting pipes called risers are designed to reach from the blow-out preventer (BOP) at the top of the well, but on the seabed, and the platform. These must allow the rig to rise and fall with the tides and so models of behavior have to be written to design ways of allowing this.

An alternative is to use a drillship to do the exploration. The drillship has the rig mounted in the middle of the ship, and can thus move around somewhat more easily than the others. It is generally held in position by dynamic positioning while drilling. (Video here).

Drill ship (Stavanger Oil Museum)

Once the field has been established, then a larger production platform can be brought out and placed where it can, using directional drilling, reach the best places to extract oil from the field. It is these large structures, such as that the Orlan platform from which Sakhalin Island oil finally began to flow recently, or the Thunder Horse, or Mars platforms. Although the former was due to produce by 2005, it was delayed by damage from Dennis and did not get up into major production until the end of last year, while the Mars platform was extensively damaged by Katrina. it is now back in production.

One of the problems with using these large platforms for Deepwater recovery is that they focus collection and so when these two are disabled, for example, they take about 400,000 bd out of production. And once they are damaged they are not so easily replaced. Back when I first wrote on this subject, in 2005 demand for rigs so strong that, as the International Herald Tribune reported
"If a customer comes today with an order, he'll have to wait until 2009 for delivery," Choo said in an interview last week. "That's how busy we are. If he's willing to pay more, he can get a rig by 2008 from our American shipyard."
By 2008 demand was such that prices had risen to half a billion dollars for a drill ship.

The original article noted that while it may only take 2 years to build a rig, the yard could only work on 8 at a time, and thus current deliveries were for 2009. The more recent story notes:
As a result, drilling costs for some of the newest deepwater rigs in the Gulf of Mexico — the nation’s top source of domestic oil and natural gas supplies — have reached about $600,000 a day, compared with $150,000 a day in 2002.

These record prices have spurred a new wave of drill-ship construction. This boom could lead to renewed offshore oil exploration that would eventually bring more supplies to the oil market, and push down prices.

Already, 16 new drill-ships are scheduled to be delivered to oil companies this year — more than double the number delivered over the last six years combined. In fact, 75 ultra-deepwater rigs should be delivered from 2008 to 2011, according to ODS-Petrodata, a firm that tracks drilling rigs.
The Chinese have also introduced a new design which is circular.
The Sevan Driller is the world’s first of its kind, with the most advanced deep-water drilling capabilities that allow it to drill wells of up to almost 13,500 metres (40,000 feet) in water depths of up to nearly 4,200 metres (12,500 feet) and an internal storage capacity of up to 150,000 barrels of oil.

The owner is Sevan Marine. The construction of this rig started at COSCO Nantong Shipyard in May 2007 and was relocated to COSCO’s Qidong Shipyard in April for derrick erection and final commissioning activities. The rig is due for delivery in the third quarter of this year and will be deployed by Petrobras in the Santos Basin, off the Brazilian coastline.
As of last week it was on its way to Brazil (which takes about 75 – 80 days) where it will drill in the Campos Basin in just over a mile of water.

Again this is a very, very brief and simplified look at some of the ways oil and gas can be produced from under the sea. It barely touches on some of the difficulties that are encountered, however. The sinking of the one barge shown at the top of the post could have been also repeated with pictures of other rigs in storms, and in battered condition.



12 comments:

  1. I do a job I really, really love and I kind of have fun with. People think you can't be grown up unless you're moaning about your job. modern day slavery for a job
    Job oppurnity for nigerian peopole as well as international people, submit Rig Job Vacancies Offshore opportunity

    ReplyDelete
  2. Hello! This post couldn’t be written any better! Reading this post reminds me of my previous room mate! He always kept chatting about this. I will forward this page to him. Fairly certain he will have a good read. Thank you for sharing!
    ____________________________
    Water drilling Coffs Harbour

    ReplyDelete
  3. Nice Blog Thank you for Sharing information about such products. For Exploration Products like Wire Line Core Barrels visit Focus Mining .

    ReplyDelete
  4. Nice Blog Thank you for Sharing information about Drill Rigs and their images. For Drill Rigs visit Focus Mining .

    ReplyDelete
  5. Oil well drilling drill pipe wiper balls can wipe cement, fluids, debris, and separate liquids from drill pipes and tubing. You can use them to wipe drilling fluids and displacement fluids of any kind.

    Fluids can be separated using drill pipe wiper balls and drill tubing and drill pipe can be removed of cement, fluids, and debris.

    These drill pipe wiper balls are made from natural rubber and are temperature-resistant from 40°F (4°C) to 302°F (150°C). It can bend between 380 and 440%, so even small obstructions won’t be damaged.


    Email: meritautomotive@gmail.com
    Drill Pipe Wiper Balls
    Drill Pipe Foam Wiper Ball
    foam wiper ball manufacturer
    foam wiper ball for 6-5/8in drillpipe

    ReplyDelete
  6. Thanks for this post…Drilling Rigs can be massive structures housing equipment used to Drilling Rigs OEM Spare Parts, Drilling Rig. We are the largest drilling company in the Middle East, and Africa operate an expansive fleet of rigs that includes. Such as Drilling Rigs Dubai, Saudi Arabia, UAE, Africa.
    Soilmec Spare Parts
    Geotechnical Tools
    Horizontal Directional Drilling
    Construction Drilling

    ReplyDelete
  7. A drill rigs on tracks is a powerful and versatile piece of machinery used primarily in construction, mining, and geotechnical exploration. Unlike traditional rigs mounted on wheels or stationary platforms, this type of rig is equipped with tracks (similar to those on a tank or bulldozer), allowing it to traverse rough and uneven terrains with ease.

    The tracked drill rig typically features a robust frame supporting a drill mast, where the drill bit is mounted. It can be equipped with various drill heads and bits, depending on the application, whether it's drilling for water, oil, gas, or geotechnical sampling. The tracks provide stability and traction, making it ideal for working in challenging environments, such as rocky slopes, soft ground, or areas with limited accessibility.

    Modern drill rigs on tracks often come with advanced hydraulic systems, automated controls, and safety features to enhance operational efficiency and protect operators. They are valued for their mobility, power, and ability to perform in difficult conditions, making them essential equipment for many industrial applications.

    ReplyDelete
  8. Geotechnical drilling is a specialized form of drilling used to investigate the subsurface conditions of a site. It involves drilling boreholes to collect soil, rock, and groundwater samples, which are then analyzed to determine the physical properties of the ground. This information is crucial for designing foundations, assessing the stability of slopes, and identifying potential geohazards.

    The process typically involves using a drill rig—either truck-mounted or track-mounted—depending on the site's accessibility and terrain. During geotechnical drilling, various techniques like rotary drilling, auger drilling, or percussion drilling may be employed based on the specific requirements of the investigation. The collected data helps engineers make informed decisions about construction projects, ensuring safety and structural integrity.

    ReplyDelete