Tuesday, December 28, 2010

OGPSS - The trade in LNG

Just before the Christmas break the United Kingdom was going through some concerns over natural gas supply. Stored gas levels were falling and the National Grid posted a “Gas Balancing Alert” for only the second time since they were instituted. But there is no more urgent talk of such a problem – what happened?

Well the answer is that rescue, in the form of Liquefied Natural Gas (LNG) tankers came trundling over the horizon. Just this week the UK opened an expansion of the terminal at the Island of Grains that can now accommodate larger tankers, at the rate of 5 a week. LNG from the tankers to this terminal can now supply up to 20% of the national need for gas. But that is a little late for the past crisis (due to scheduling problems the first tanker won’t dock until next week) so where did the LNG come from, and where did it go ashore?

LNG tankers arriving at the Island of Grains and at the LNG terminals at Dragon and South Hook fed additional supplies into the grid.
Flows of LNG were at a total 100 million cu m/d Tuesday after South Hook ramped up 10 million cu m/d to 55 million cu m/d, Dragon was at 15 million cu m/d and Isle of Grain contributed 30 million cu m/d to the system. That is a total increase of 25 million cu m/d on levels Monday.

LNG is also going to be backed up by fresh deliveries in the next week, with UK port data showing three fresh LNG cargoes expected to berth at South Hook from Qatar in the next week, including the Umm Al Amad expected sometime Tuesday, the Mozah on December 23 and the Aamira on Boxing Day.
(The UK used 468 million cu.m. on Monday Dec 20th).

There is a growing global trade in LNG, and while most of this is committed to long-term contracts there is sufficient flexibility in the system so that when, unexpectedly, a nation may run short or a strike close a port, a tanker may be diverted. The South Hook terminal is 67.5% owned by Qatar Petroleum, and is part of a supply net that takes LNG from the Qatargas 2 train, and sends it to the Welsh terminal where it is re-gasified and fed into the National Grid. Dragon, which is also at Milford Haven, is a smaller terminal, and came on line in August 2009. The term “train” is used to describe a single processing line that produces LNG within an overall plant. Thus, for example, when BP expands its facility in Indonesia, the new plant will be called Train 2, to distinguish it from the existing line, which is train 1.

LNG tanker at the Dragon terminal

Once natural gas is produced from a well it must first be processed, and the non-gas liquids (NGLs) as well as water, carbon dioxide, and other contaminants removed so that a dry commercial gas can be sent on. Where the customer is not easily served by a pipeline (such as the case with gas from Qatar being supplied to the UK), the only viable option is to send the gas by ship. Given, however, that gas in its natural state is of low density, it is most practical to cool the gas down to the point where it liquefies. By lowering the temperature to -260 degF the gas turns into a liquid, and occupies 1/610th of the volume. This makes it much easier to store and transport, though it requires that the liquid be kept at that low temperature for the duration of the voyage.

Because the process involves three steps, liquefying the gas, transporting it in special tankers, and then feeding it through a re-gasification plant into a distribution network, the investment in each requires some assurance of a pre-existing market and agreement between the parties before the investments are made. Thus, for example, NTPC in India is now negotiating with Qatar on the supply of LNG in the future as insurance that, when a pipeline is laid from the re-gasification plant at Kochi to power plants at Kayamkulum, that a supply will be available for it. As with the Welsh plant, this can, to a degree, be assured by having Qatar as one of the partners in the project.

The parties likely agree, when making such a deal, to a fixed-price over a considerable time frame. South Korea, for example, is paying roughly $10 per kcf, somewhat above the current rate, but it will have that price for 20-years. Such an agreement may, however, make it difficult for the buyer to initially find customers in the years when that is a high price, as CNOOC found.

Qatar is the largest producer of LNG, having just announced a capacity for delivering 77 million tonnes of the liquid a year, which it currently delivers to 23 countries. This trade has grown from nothing to its current level in 14 years, with production centered around the port of Ras Laffan. (A tonne of LNG converts into 1,460 cu m of NG, or 51,600 cu. ft).

There are seven separate plants (trains) at Ras Laffan with the last having come on stream last February.
Ras Laffan 3 Train 7 is the fourth 7.8 million tons per year LNG plant brought online by Qatar Petroleum and ExxonMobil joint ventures within the past 12 months. It matches the capacity of Ras Laffan 3 Train 6, one of the largest operating LNG production facilities in the world, inaugurated in October 2009. These mega facilities have sufficient scale to competitively reach markets around the globe. Qatar's giant North Field, which is estimated to contain in excess of 900 trillion cubic feet of natural gas, will supply both trains.
Once the gas is liquefied it is transferred to one of a fleet of ships. The earlier ones had the characteristic spheres on board, as shown above, and, for example, Train 1 at Qatar uses a fleet of 10 of these to carry LNG to Japan, with a round trip taking a month. The more recent fleet is 80% larger and more efficient, this 32-vessel fleet carries LNG from Qatar trains 2, 3 and 4.

While there has been a growing market for LNG around the world, and re-gasification plants, such as those in Wales, are being developed in many countries (note the 23 countries that are customers to Qatar) the availability of LNG, with new facilities being planned in countries such as Australia likely means that there will be a continued relatively cheap supply available for a number of years. The consequences to the profitability of domestic production, such as shale gas in the USA, may become more questionable as a result.

Read more!

Sunday, December 19, 2010

OGPSS - pipelines, a help that can be costly

I have written about the limitations in the free flow of oil because of the increasingly heavy and sour nature of the reserves that are now being developed, and the need for suitable refineries to process that oil. I then wrote about how it’s not just oil from oilwells, but also the non-gas-liquids (NGLs) that count toward the total volume of oil that is consumed in the world. There are other constraints to production, and the one that I’m going to talk about today is that of transportation. It seemed appropriate at a time when Chevron has just announced a doubling of the size of the pipeline from the Tengiz field in western Kazakhstan to Novorosslysk on the Black Sea. It will now carry some 1.4 mbd of oil to the port, whence it will be transshipped in tankers.

Transportation is, of course, a major problem for many energy forms, as Leanan caught, the Chinese are already facing problems this winter over the distribution of power.
Most of China's resource production bases, including coal and and oil, are either concentrated in the northern or western provinces, away from the key demand areas located in the southern and eastern region, such as Shanghai and Guangdong.

Any supply shortfall could prompt a surge in import demand as utilities and firms seek alternative fuel supplies to feed their power plants.
And it turns out that they are not the only ones. As the new snowfall wraps over the United Kingdom there are concerns over the distribution of fuel oil.
Downing Street was forced to respond to reports that heating oil might need to be rationed over the winter because of rocketing prices and restricted deliveries, admitting there was a problem moving it around the country.

The energy minister, Charles Hendry, sparked alarm yesterday when he warned the House of Commons that the situation could become "very serious" if there was further snow over the Christmas period.Thousands of public buildings and an estimated 660,000 homes rely on oil for heating and Hendry told MPs some had been told supplies would not be available for four weeks.
All of which serve to emphasize a point that I wanted to make today about how the presence of a pipeline can, but not always, help the situation.

The oil and gas industries flourish largely because of these pipelines, which carry liquids easily over long distances. Perhaps the most famous is the pipeline that carries oil from the North Slope to Valdez. It has survived the varying Alaskan weather conditions, passing over permafrost and rivers, or being buried, depending on the geology. It was the only viable way to effectively develop that reserve.

Alaskan pipeline just North of Fairbanks. Note the radiators on the support legs. These disperse the heat from the pipe (and the oil) which keep the permafrost, in which the support legs sit, from melting. The 48-inch line was sized to carry 2.1 mbd of oil. Today it only carries around 660,000 bd.

Pipelines don’t just allow reserves to be extracted, consider the Rockies Express Pipeline that is bringing natural gas from Colorado through the 1,679 miles to Ohio. Before it was installed Colorado would have a surplus of natural gas in the winter, while the North East had a shortage. To a degree (Caribou Maine being still some distance from Ohio) that has now been ameliorated.

The pipeline route (Kinder Morgan )

Pipelines need to be sized for the volumes that flow. In order that the oil/gas flow down the pipe the fluid is pumped into the line at pressure, and at stages along the pipe, as the pressure is “used up” on overcoming friction from the pipe walls, there are booster stations that raise the pressure back to the driving pressure, to keep it moving. (And yes these use some of the fuel, particularly if it is gas, as a power source).

One of the problems with running the pipe under that pressure is that if there is any corrosion or damage to the pipe then the pressure may have to be lowered to stop the pipe from bursting. Since the flow velocity is a function of the square root of this driving pressure, then as the pressure drops so does the volume pumped.

As a result inspection to make sure there is little or no corrosion should be a regular feature of pipeline maintenance. Given that the pipe can run for miles above or below the surface, external inspection can be difficult, and, instead companies will run “pigs” down the line. (The name comes from the “squeal” as they move) These are put into the pipe at the “top” end and pumped down with the oil. Instruments and sensors within the central compartment can monitor conditions as the pig moves. Pigs are also fitted with wipers the ensure that deposits from the fluid don’t build up along the pipe and cause problems.

Example pig used in the Alaskan pipeline – see the wipers and note the central compartment within the pig.

It is difficult to stop all corrosion, and over time segments of the pipe may need to be replaced because of damage that can build up in the normal course of operations. If inspections are not regular, then, as BP found in 2006, corrosion can lead to a leak, and big problems.

Unfortunately pipelines are not just prone to mechanical problems. Their presence is hard to hide, and thus, become targets for theft. Whether in Mexico this weekend, or Nigeria almost every day, theft by physically extracting fuel from pipelines can be a very dangerous game, with explosions and loss of life a not-infrequent result.

And that is just the small scale operations. On a larger scale the risk can be a lot less. Remember that Western Europe is becoming increasingly dependent on Russian natural gas for supplies, particularly in the winter months. That natural gas travels between the two passing down a pipeline through Ukraine. The financial woes of that country meant that it did not always pay its gas bill, and, usually in January, this led to confrontations between Russia and Ukraine, with Western Europe the frequent loser. To overcome this dependence Russia is now putting in place two smaller pipelines that will circumvent Ukraine to the North (Nordstream) and the South.

One of the key players in that game was Turkmenistan, which supplied its natural gas through pipelines that only went through Russia to their customers. Russia for years was able to dictate the price that it paid Turkmenistan, often considerably less than it was getting from Europe. But since it was the only game in town . . . .

That recently changed, however, with the construction of a pipeline from Turkmenistan to China and this broke the monopoly that Russia held over the sale of Turkmen gas. The pipeline is now being upgraded and the flow increased to 1.25 billion cu ft/day, four times the volume that flowed, on average, last year. The pipeline is 4,350 miles long. Ultimately the flow will be three times that size – about the volume that Turkmenistan used to sell to Russia. (The last reference has the picture of what may be the one Soviet attempt to extinguish a burning gas fire with a nuclear device that didn’t work).

The Russians haven’t forgotten the benefits that come from owning the pipelines and the control that this gives over the producers. BP learned that lesson the hard way. Gazprom is the Russian company that owns the pipelines (and on a slow news day I could always find a story by seeing what new machinations had been revealed in a Google seach for Gazprom). By controlling the pipelines they could dictate what flowed when. As an example let me remind you of the situation that BP faced in developing the Kovykta gas field back in 2007. The deal was that after BP developed the field, they had to produce 9 billion cubic meters (bcm) per year, as the license stipulated. But local consumers could only handle a small fraction of this, and Gazprom, who owned the only pipeline in town, was only willing to allow a flow of 1.7 bcm. Oops! You guessed it, BO was held liable for not meeting the terms of the license and . . . . .

You will note that Gazprom has been quite efficient at getting control of a large portion of the pipelines and (as a result) the distribution networks across Europe.

That story brings to mind another caveat, that illustrates the bind that pipeline owners can impose on their clients. Bear in mind that these pipelines are not cheap, and while they can be installed relatively rapidly, they have to be paid for. Thus, before they are installed the owners require long-term commitments from both the seller at one end and the vendor at the other. The Rockies Express has such commitments.
REX is a joint venture of KMP (we own 50 percent and operate the pipeline), Sempra Pipelines and Storage and ConocoPhillips. Long-term, binding firm commitments have been secured for virtually all of the pipeline's capacity. The pipeline is enabling producers to deliver gas from the Rocky Mountains eastward and is helping to ensure that there will be adequate supplies of natural gas to meet growing demand in the Midwest and eastern parts of the country.
There is an underlying point here that is sometimes missed when these projects are discussed, and that is that the agreements between all parties will usually establish a price for the product, at the time that the contracts are signed, that run well into the future. Those prices do not reflect the current market price of the fuel. It is a point that often gets overlooked in discussions over fuel distribution. But many of the ways in which fuel is shipped require considerable investments not only for the production, but also for the transportation, and then for the distribution. Thus the need for commitment and guarantees before the process of construction begins. (This has just been evident in the wait in starting new coal mines in Australia, for example, until long-term contracts with China had been signed.)

However, if the pipeline owner then changes the rules, there is not a whole lot that the other two partners can do – as a whole list of countries who have been squeezed by Russia would be glad to remind you.

But it is not just over Russia that the world should have a concern. One should not forget the new pipelines that are being constructed across Asia. Whether the Chinese pipeline from Turkmenistan, or the TAPI pipeline from Turkmenistan to India, these mark a switch in the destiny of future fuel production. It is a future that means that a considerable volume of the worlds fuel may no longer be available to the West. And where that fuel is natural gas, and the nations of Europe are building gas-fired power plants to back-up wind and other renewable sources, then if the gas isn’t there . . . . .

No problem, you say, old HO is being his usual alarmist self. Well you might want to note how many times this winter there is a “Gas Balancing Alert” action in the UK. Rune Likvern has already highlighted the start of a possible problem as stocks were drawn down at the start of the winter and it has not got any better. The first Alert has been issued for this season.
On Monday the National Grid issued a gas balancing alert (GBA) for only the second time, asking power suppliers to use less gas as more was sourced overseas. Extra gas - including supplies from Belgium and Norway - was necessary to meet rising demand after a 30% rise on normal seasonal use during the cold snap.
This is only the second such alert, the first coming last January.

Further information can be found on the National Grid Website. The normal daily usage at this time of year, according to that site, is 364 million scm (standard cubic meters). The trigger for a GBA is 452 mscm, and tomorrow’s demand is forecast at 463 mscm. Interruptions seem most likely to occur in the North.

Oh, and just to give you a better sense of the scale of some of these pipes - here is me beside the one in Alaska.



Read more!