Some of the oil that is being held in tanks near the Mt Redoubt volcano is to be removed by a tanker this weekend The tanks are protected by an earthen dam, that is still holding, but the tanker will remove about 840,000 gallons of the 3.1 million gallons that is held in each of the two storage tanks.
The amount of oil that is held (as kerogen) in the oil shale of the Piceance Basin in Colorado may be more than 50% greater than at first thought, according to the latest U.S. G. S. figures. However it is still not that easy to extract, and while the Department of the Interior is encouraging research and development of concepts for extraction, they are not encouraging development of the leases, as yet. Shell, for example, is now testing the freeze wall concept for keeping water from the refractory zone during the heating of shale in place to convert and extract the oil. General Synfuels International have announced a breakthrough in extracting the energy through gasification they have also secured a parcel of land, and are acquiring the components to build a production prototype with testing next year.
Predictive production numbers from Mexico have been dropped an additional 30,000 bd, down to 2.72 mbd. This will, in turn force a cut in exports, which cut may reach 18% next year with overall production falling below 2.5 mbd, and exports falling below 1.125 mbd. This implies a drop of 245,000 bd and the question, since most of that comes to the United States, is where will the volume come from to make up the loss? Export levels for this year are already below prediction. In order to raise money for more investment in production Pemex has sold $712 million in new bonds. And while the company promises more investment, and new wells for Cantarell the overall prognosis does not look good, as the company continues to fail to meet targets.
In the continuing saga of the wind farm projected to be built where Senator Kennedy sails, the Interior Department is promising a ruling on Cape Wind. The project has seen numerous challenges as it has moved forward, which led to publication of a book, (which I reviewed over on TOD). The ruling is anticipated to come about in a couple of months, with the implication of the Secretary’s remarks being that the project may be allowed to move ahead. In the UK there are plans for a new wind farm off Norfolk, capable of generating 315 MW. Construction is slated to start early this summer, with production from the 88 turbines anticipated to start coming ashore in 2011. British plans do not, however, seem to be keeping up with earlier predictions in terms of the volume of renewable energy that will be available to meet targets. And there has been some heated debate in Dekalb county, outside Chicago about plans for a 133 turbine farm to be installed near the Windy City.
The predictions for Hurricane activity in the Gulf have been lowered to only 13 named storms this year. Only 3 – 4 of these should reach major strength.
The amount of oil that is held (as kerogen) in the oil shale of the Piceance Basin in Colorado may be more than 50% greater than at first thought, according to the latest U.S. G. S. figures. However it is still not that easy to extract, and while the Department of the Interior is encouraging research and development of concepts for extraction, they are not encouraging development of the leases, as yet. Shell, for example, is now testing the freeze wall concept for keeping water from the refractory zone during the heating of shale in place to convert and extract the oil. General Synfuels International have announced a breakthrough in extracting the energy through gasification they have also secured a parcel of land, and are acquiring the components to build a production prototype with testing next year.
Predictive production numbers from Mexico have been dropped an additional 30,000 bd, down to 2.72 mbd. This will, in turn force a cut in exports, which cut may reach 18% next year with overall production falling below 2.5 mbd, and exports falling below 1.125 mbd. This implies a drop of 245,000 bd and the question, since most of that comes to the United States, is where will the volume come from to make up the loss? Export levels for this year are already below prediction. In order to raise money for more investment in production Pemex has sold $712 million in new bonds. And while the company promises more investment, and new wells for Cantarell the overall prognosis does not look good, as the company continues to fail to meet targets.
In the continuing saga of the wind farm projected to be built where Senator Kennedy sails, the Interior Department is promising a ruling on Cape Wind. The project has seen numerous challenges as it has moved forward, which led to publication of a book, (which I reviewed over on TOD). The ruling is anticipated to come about in a couple of months, with the implication of the Secretary’s remarks being that the project may be allowed to move ahead. In the UK there are plans for a new wind farm off Norfolk, capable of generating 315 MW. Construction is slated to start early this summer, with production from the 88 turbines anticipated to start coming ashore in 2011. British plans do not, however, seem to be keeping up with earlier predictions in terms of the volume of renewable energy that will be available to meet targets. And there has been some heated debate in Dekalb county, outside Chicago about plans for a 133 turbine farm to be installed near the Windy City.
The predictions for Hurricane activity in the Gulf have been lowered to only 13 named storms this year. Only 3 – 4 of these should reach major strength.
Read more!
Labels:
Cantarell,
Cape Wind,
Chicago,
hurricane prediction,
Mexico,
Mt. Redoubt,
Oil Shale,
oil tanks,
Shell,
Wind farms
Wednesday, April 1, 2009
P58. Pick Points
Back in November 2007, with relatively little notice Con Edison ended a service begun by Thomas Edison in 1882. It was the transmission of electric power by direct current (D.C.) in New York. There was fierce rivalry back then between Edison, who favored D.C, and George Westinghouse who was pushing Nikola Tesla’s alternating current (A.C.).
Some 125 years later, Westinghouse finally and absolutely has prevailed as the world has moved to AC. Or has he? Back a couple of years ago I was at an ASPO meeting when Dave Rutledge (who is inter alia a Division Chair at Caltech) mentioned the resurrection of DC power transmission. At first I thought this was a mis-speak so I asked him about it afterwards, and no I had heard him right.
So there I was, today, half-listening to Dr Chu build up to explaining what the Helios Project at the Berkeley Lab was all about, when I heard him comment on the Smart Grid, and the benefits of transmitting current across the country using D.C. lines rather than AC. Unfortunately the feed I was watching (this was from last July) did not have a timer on it, but this was about a third of the way into the talk.
Dr. Rutledge had mentioned that one of the places that uses D.C. is in Denmark, and sure enough, cables between Norway and Denmark do transmit power using D.C., and they are adding more.
In modern systems high voltage D.C. lines are less expensive and suffer lower transmission power losses than A.C. lines, but require more expensive transformers to raise the voltage to the high levels required. One of their advantages, however, is that they make it easier to integrate remote generating capacity into a network. This will become more important as renewable energy sources dotted around the country start to be available for integration into a new Smart Grid in greater numbers.
While the wave energy program in Portugal is in hiatus, a project to further study its use in Hawaii is making progress with the system to be upgraded. There is a difference between tidal energy and wave energy, and in Scotland Aquamarine is picking the latter to be a better bet than the former. The wave energy program is known as Oyster. Further a new Israeli turbine is being developed which is claimed to reduce costs, and there is a competing idea being developed in Ireland.
Gazprom anticipates that its exports will drop some 17% this year and that prices will also drop. It is therefore not surprising that they are looking more favorably at LNG and new projects that will open this additional avenue for sales. It does not seem that long ago that they were arguing the other way, with all their efforts being put into pipeline transmissions. This was particularly true for Shtokman development, though now this is where business is anticipated to gestate.
While the volcanic eruptions at Mt Redoubt are apparently calming down , they are generating a bit of a problem for the local oil production facilities
And Russia is proposing a nuclear power station for Bangladesh . The facility would produce 1,000 MW and help meet the growing need (and shortage) of power in that country.
And in China they are getting the wires to build superconducting cables to move electricity. Superconducting cables can handle up to ten times the power of conventional cables and have additional benefits when transmission lines become congested.
Some 125 years later, Westinghouse finally and absolutely has prevailed as the world has moved to AC. Or has he? Back a couple of years ago I was at an ASPO meeting when Dave Rutledge (who is inter alia a Division Chair at Caltech) mentioned the resurrection of DC power transmission. At first I thought this was a mis-speak so I asked him about it afterwards, and no I had heard him right.
So there I was, today, half-listening to Dr Chu build up to explaining what the Helios Project at the Berkeley Lab was all about, when I heard him comment on the Smart Grid, and the benefits of transmitting current across the country using D.C. lines rather than AC. Unfortunately the feed I was watching (this was from last July) did not have a timer on it, but this was about a third of the way into the talk.
Dr. Rutledge had mentioned that one of the places that uses D.C. is in Denmark, and sure enough, cables between Norway and Denmark do transmit power using D.C., and they are adding more.
In modern systems high voltage D.C. lines are less expensive and suffer lower transmission power losses than A.C. lines, but require more expensive transformers to raise the voltage to the high levels required. One of their advantages, however, is that they make it easier to integrate remote generating capacity into a network. This will become more important as renewable energy sources dotted around the country start to be available for integration into a new Smart Grid in greater numbers.
While the wave energy program in Portugal is in hiatus, a project to further study its use in Hawaii is making progress with the system to be upgraded. There is a difference between tidal energy and wave energy, and in Scotland Aquamarine is picking the latter to be a better bet than the former. The wave energy program is known as Oyster. Further a new Israeli turbine is being developed which is claimed to reduce costs, and there is a competing idea being developed in Ireland.
Gazprom anticipates that its exports will drop some 17% this year and that prices will also drop. It is therefore not surprising that they are looking more favorably at LNG and new projects that will open this additional avenue for sales. It does not seem that long ago that they were arguing the other way, with all their efforts being put into pipeline transmissions. This was particularly true for Shtokman development, though now this is where business is anticipated to gestate.
While the volcanic eruptions at Mt Redoubt are apparently calming down , they are generating a bit of a problem for the local oil production facilities
With oil terminal operations suspended at Drift River, Cook Inlet oil producers are running out of space to store crude. Chevron shut in two of the 10 platforms it operates Monday night, spokeswoman Roxanne Sinz said Tuesday. The Bruce and Anna platforms normally produce about 71,000 gallons of oil a day, Sinz said.
Production was reduced by about 21,000 gallons daily at the Dolly Varden platform because of ash, Sinz said. . . . .
In Cook Inlet, with Drift River out of commission and no means to move oil to market, only seven days of storage remains at the production facility at Trading Bay, while tanks at Granite Point to the north have about four more days of storage, Chevron's Sinz said.
When the space is gone, either Drift River has to reopen or the platforms must be shut in, Sinz said.
Cathy Foerster of the Alaska Oil and Gas Conservation Commission said some wells could be forever lost if they are not continually producing. But crews can continue to pump oil from those wells into other wells if there are no tanks to store the oil, she said.
At the news conference Tuesday, representatives from the Alaska Department of Environmental Conservation, the Coast Guard and Cook Inlet Pipeline Co., which owns Drift River, said their main concern continues to be the 6 million gallons of crude stored at the terminal. The facility was evacuated last week, but the pipeline company has sent crews to inspect it when it's been safe to fly.
And Russia is proposing a nuclear power station for Bangladesh . The facility would produce 1,000 MW and help meet the growing need (and shortage) of power in that country.
And in China they are getting the wires to build superconducting cables to move electricity. Superconducting cables can handle up to ten times the power of conventional cables and have additional benefits when transmission lines become congested.
Read more!
Labels:
Alaska,
DC power transmission,
LNG,
Mt. Redoubt,
Russia,
Rutledge,
Shtokman,
superconducting cables,
volcano