Showing posts with label retorting. Show all posts
Showing posts with label retorting. Show all posts

Friday, April 2, 2010

Charcoal, Oil Shale and the Ecoshale process in Utah

If you drive West from St Louis (as I did Thursday after my check-up*) you will occasionally hit a pocket of air that smells a little sweet, and a little burnt. It is the product from the charcoal kilns up near Vienna, one of the larger centers for making charcoal in the country. Apart from its use in making barbeque, charcoal has other beneficial uses, and it is projected that it has been used over many millennia. Modern consumption in the United States runs around 375,000 tons.

To really simplify the technology for making the fuel (which may become a unique post at some future point)
Making charcoal from poor-quality timber and sawmill waste is a process that has changed little in centuries.
Before it becomes dimensional lumber, every log harvested in the Ozarks first must be sawed square. The bark covered slabs produced by that first cut become the raw material for charcoal briquettes. Seasoned hardwood is sealed in an air-tight enclosure and allowed to burn with the barest minimum of air. Just like in a woodstove with the damper closed, the wood slowly turns to almost pure carbon as its lighter, more volatile components are driven off by heat. This process, called pyrolysis, can occur in a pile of wood buried in a hole in the ground or inside a metal or concrete box called a Missouri-type charcoal kiln. For years, making charcoal was one of the few sources of income for people in the Ozarks.

In the modern, larger scale version of that process the sawdust or waste wood is treated in something that looks like a refinery:

Modern charcoal plant at Bell,MO (MO DNR )

However, in the earlier times the kilns were made up with earthen and turf walls to seal in the charcoal as it cooked. And it is that technology that I want to return to today in another post on Oil Shale, in this case discussing the EcoShale project in Utah.

The Ecoshale project is being promoted as a new approach to obtaining oil from the shales of Utah. The company proposing this “In-Capsule” process had a fair-sized booth at the MinExpo meeting in Las Vegas a couple of years ago, that drew my attention. I stopped by and watched the video (twice) picked up literature, and talked to one of the folks at the booth. Since there is considerable oil (well actually kerogen) locked up in the shale (perhaps as much as 1 million bbl/acre it is worth seeing what they have planned. I will include a few thoughts as I go through the process.

Those in the UK might want to visit Ian West’s site which gives some history to shale burning in the UK.

Until now I have largely, in the recent posts on oil shale, focused on the thicker layers of oil shale in Colorado, but there are places in Utah where the oil shale near the surface is more than 10 ft thick, and where the shale will yield more than 25 gal/ton. With prices of oil fluctuating, the grade at which production becomes possibly economic will vary, but for the following discussion I am going to assume that a ton of ore will yield about ¾ of a barrel of oil. I will also assume, for simplicity, that a ton of shale occupies 14 cu. ft. before it is mined. The plans for the project, at the time of the MineExpo presentation, were that it would be scaled to produce 30,000 barrels of oil per day, at an anticipated cost of roughly $3 billion. This has now been split into plans for a 9,500 bd commercial project prior to that larger operation. Red Leaf, the company, holds leases to 17,000 acres of this shale (with an overall average of 25 gal/ton, ranging up to 70 gal/ton).

Typical surface oil shale site in Utah (Red Leaf )

General overview of the site

The first thing that happens at a site is that the overburden, and shale that doesn’t have a high enough oil content is removed and stored for site remediation after the process is over. (I am going to use oil to describe the hydrocarbon content, ‘cos it’s shorter to write than kerogen. ) This will require a significant area, since the volume of rock being uncovered every day is going to be large. There are going to be three operations going on at one time, in order to make the process work. The first is the removal of the overburden, the second is the preparation of a site to act as a retort, and the third is the mining of the oil shale and the building of the retort. The retort is then left in place to “cook” the oil/kerogen over a period of some 90 days, before the site is reclaimed. Retort preparation will take place in a space where the shale has already been taken out. (This requires the initial removal of an additional volume of shale that has to be set aside and stored to give the space for the first retort to be put in place.) This is because the underlying bed must be prepared, and the infrastructure for the retorting has to be put into place.

To get just a little ahead of myself, the process of retorting the shale involves mining the shale, and then building the broken rock into a crushed zone, through which pipes have been placed, that will carry natural gas to heat the rock. The rock is then covered with a thick layer of an impermeable rock (for simplicity I am going to assume a crushed claystone) that will act as a seal. In this way the shale is encapsulated, and as the heat from the gas works then so, as with the wood in the charcoal kiln, the rock is processed, the hydrocarbons driven off, and collected in drainage tubes that are interspersed through the layer.

Schematic of the Ecoshale process

If we look at the operations required for the full 30,000 bd operation. The mining of the shale will require some 40,000 tons of rock to be mined and moved every day for production, as well as the removal of the overlying rock from the next batch down the strip. This is equal to around 560,000 cu ft of rock. For the sake of discussion, if the strip being mined is 50 ft wide and the shale seam is 35 ft high, this will require that each day the mine will move a panel that is 320 ft long. However this isn’t all the rock that is required. Because before the shale that is mined can be placed in the retort zone, a layer of clay will be placed over the pit section in order to give an impermeable barrier below the shale to stop contamination of the underlying rock and any water that it contains. This layer is going to have to be very thick, since the oil shale above it is going to be heated to the point that it releases the oil. This takes a temperature of 900 deg. At that temperature the clay will bake and becomes very brittle, so the clay layer must be thick enough to allow for this and allow enough temperature drop to leave the lowest layer still flexible enough to act as a seal. Let’s assume for now that this is going to need a layer that is 3 ft thick. (I’ll come back to this later.) In a recent test of the process the seal provided also included a plastic sheet as well as bentonite. (Presentation slide 19).

Once this clay has been placed (and it should slope at about 5 degrees toward the open face to allow for effective drainage), then the mined shale can be placed on top of it. Drainage pipes are placed near the bottom of the shale layer, then more shale is added, and a heating set of pipes is laid across the shale. These pipes are connected at the back of the day’s pile, so that the gas that will pass through them will also move back through the pile and back to the face of the pile for collection. More collection pipes are then placed as the pile rises and is flattened over the recovery site. The pile will be considerably higher than the mined area since, in mining the shale it also “bulks” in volume by about 60%. The reason for this is that the pieces no longer fit exactly together. Think about a jigsaw puzzle. When the puzzle is made it only occupies a small area of the table, but when all the pieces first come out of the box they fill a much bigger space, because of all the empty space around each bit, and that the pieces are all separate. It is the same thing for rock. (Some of those internal spaces will be filled as the shale heats and degrades, so that the pile may collapse a little during the heating process). Thus the pile that will be made will be have to fit into the same “footprint”, i.e the 50 ft deep, 320 ft long shape it came out of, but will now be 56 ft high. With the underlying clay layer this will make the pile some 59 ft high at this point. (And require about a thousand tons of clay a day)

Drainage pipes on bentonite at the bottom of the test retort (Red Leaf)

By going through this process the mine is creating a “use once” retort that encapsulates the spent shale, and collects the retorted products without some of the disadvantages of a more conventional retort. These include (from the brochure) protection of groundwater, lack of need to sequester tailings, and obviation of the problems of retort clogging and moisture retention within the retort.

Now the mine has to seal the retort to keep the retorting heat within the shale and not to let it, or the gas and oil generated out. So a cap will be placed over the broken shale and, for the same arguments as above we will assume for now this is also going to be about 3 ft thick. (I hope it doesn’t rain much in this part of Utah. The impact of water on clay/shale at 900 degC is spectacular, since the clay shatters explosively and is easily eroded).

Collapsed cavity where high-temperature overlying shale fragmented and “blew out” after being hit by a water stream. (site in Montana)

This will take the pile up to 62 ft high, which is quite a bit higher than the original 35 ft. It is interesting that the brochure suggests that this will be a “low temperature, stationary heating” given that the initial temperatures to liberate the shale have been documented (as noted above) at 900 degC. And my memory suggested that that number also cropped up in my conversation at the booth. It will also have to have a front panel of a sealing rock and clay placed over the face of the section, in order to complete the capsule.

Representation of encapsulation

Now the heating pipes are connected to a natural gas burner that will feed the hot gases into the heating pipes, gradually bringing the shale up to the temperature where the transformed oil can flow to the collection pipes, and any gas produced can also be collected. The booth spokesman told me that they anticipate that the natural gas needed can be collected on site, and that the heating will take a total of 90 days to heat the shale to the point that all the hydrocarbon content has been recovered. That means that the retort section of the mine will be roughly (90 days at 320 ft per day) 5.5 miles long.

After retorting is complete, the heating element will be disconnected and the shale and overlying clay allowed to cool. It will then be covered with the initial overlying rock that will be restored to roughly original contour, and the ground fertilized, seeded, and the ground cover re-established.

While the brochure cites the approbation of the Governor of Utah, the commendation for the project was written at the time that the price of oil was some $120 a barrel, so we may have to wait a short while until it gets back to that level before the project starts to take off.

By December 2008 the project was reported to have invested some $15 million in research and development of the process. They are currently in development of a large-scale pilot demonstration. Information on the web site, however, is a little sparse concerning current progress, through oil was apparently produced in November 2009.
Ecoshale's synthetic product has properties rated by the American Petroleum Institute (API) as 39 condensate oil and between 34 and 35 prompt oil with no fines, or impurities, in the oil.

Based on the test study, Nelson projects full-production at 30,000 barrels a day would cost $20.21 per barrel, not including transportation
.

My concerns with this come in the transition from a single retort which can be built to quite high standards, to the operation of even a smaller continuously operating system, where there are likely to be considerably more and larger problems with operation than appear evident at this stage in the process.

* My thanks again to those concerned after my eye problem arose, the surgeon told me yesterday, 3 weeks after it happened, that I now am back to 20/20 vision – albeit using glasses. I remain highly impressed with what modern surgery can achieve.

Read more!

Sunday, February 7, 2010

Oil Shale, a future source of oil?

One of the large numbers that is often quoted in response to the concerns that some of us express over future energy supplies relates to the amount of oil that is present in oil shale. However, there seems to be a general consensus among many that write about world energy, that the 2 trillion barrels of oil potentially available out of the 4 trillion barrels locked in the United States oil shales are not, at the present time, a realistic source of supply. So for the next couple or more weeks these weekly tech talks will be discussing oil shale. The Federal Government is reviewing the leasing process for these lands, and so it might be timely.

After an eleven year hiatus, Colorado School of Mines reactivated their annual Oil Shale Symposia in 2006, and has been hosting them since then, with the last one being held last October. And the resource is not quite the nonentity that it may at first appear.
Japan started oil production at Fushun in 1929, and developed, in less than ten years, the world's largest oil shale industry. Shale oil was a principal source of fuels for Japan during World War II. Fushun production continued to expand under Communist China and may be 40,000 bpd presently.
That quote was from a paper in 1964, more recently the USGS have noted an annual production of around 415,000 barrels. it is therefore justifiable to take a little closer look at this whole issue and try to explain some of the technical state of affairs, point out a little of the disingenuousness of some of the statements that have been made, but largely leave the political discussion to others. I will largely, at least initially, deal with deposits in the USA, though there has been a significant industry in Estonia since 1916, though the deposits are anticipated to be exhausted within the next 30 years.


Unfortunately the last time that a serious look was taken at the US resource was back in the 1970's and 1980's, when at one time, under the Project Independence Blueprint, a shale oil production target of 1 million barrels of oil per day was projected, in line with President Ford's State-of-the-Union Message of 1975. That program, in turn, was based on the considerable amount of research that had been carried out, both in the US, and abroad, and on an initial evaluation of practical means to meet the target. But before one looks at that target, and its feasibility, perhaps it is better to look a little more closely at the information which led up to the prediction.

To begin with, while the basic definition of an oil shale suggests the fine-grained rock that is often called shale, and implies it is impregnated with oil, that might be easily recovered, Unfortunately, in most cases the rock is not a shale, and the organic material that it contains is not yet an oil that will not run out, or separate out with normal treatment. It has been described as a precursor to oil, in that, it was initially formed in the same way, but has not undergone the natural high-temperature and pressure regimes of deep burial in the earth that are needed to turn it into oil. (However, if additional kerogen were to be added to the shale it would through time more likely end up as a coal). The material is known as a kerogen, and to date the most successful methods of removing it from the rock has been to heat the rock until the contents volatize, and then to condense the hydrocarbons back out (in the same fashion that one cracks the oil in a refinery - though there are some significant differences that I will get to later). However, since the initial natural process was not carried as far as with oil, then the amount of energy that is required is generally greater. The greatest deposits of interest are those found in relatively thick deposits around the point where Wyoming, Colorado, Utah, and Idaho come together.

From Donnell, 1st Oil Shale Symposium, 1964.Location of the major oil shale deposits. A section through the lettered points in the above figure gives:

Note that the scale for the vertical section is in feet.

The darker band shown is known as the Mahogany zone in which the Mahogany bed some 100 - 200 ft thick, is considered to be the richest layer, and is a marker for the deposit.
In oil shale from the Mahogany zone of the Green River Formation in Colorado, the ratio of oil yield to organic matter (weight percent) is 0.659; the ratio of oil yield to organic carbon (weight percent) is 0.818; the ratio of organic matter (weight percent) to oil yield (gallons per ton) is 0.580, and the ratio of organic carbon (weight percent) to oil yield (gallons per ton) is 0.467.
Shale oil has been used as a fuel source in a number of countries around the world, over the past 150 years, but only become of economic significance in the 1920's, as noted above. There have been over two thousand patents issued describing different ways to separate what, for convenience, I will call oil, from the shale (similarly called). Only a few have, however, been demonstrated, and later in this series of posts I will explain some of the peculiar problems that arise in retorting oil shale. But, as an illustration of the type of process that could be used, I will describe the Gas Combustion Process, as developed by the US Bureau of Mines for one of its original experiments. I thought it would be useful to describe this in a little detail, since it points out some of the potential benefits that can come from retorting the material.

Early Oil Shale Processing Retort (DOE )

The retort can be simply thought of as a vertical pipe with the raw shale fed into the top. As it moves down through the retort it passes through four zones. At the top of the retort the shale is cold, and the gasses rising from the lower parts of the process, mix with this shale. This has two effects, it pre-heats the shale as it drops into the next zone, while at the same time the oil is condensed into a mist, and the product gasses are cooled. (They are both then collected as they leave the retort). As the shale continues to move down the retort it reaches, about half-way down, a series of ports that inject air mixed with a portion of the produced gas that has been collected (call this the dilution gas). These two combine to cause ignition and to raise the temperature of the shale (to between 700 and 950 degrees F) so that the hydrocarbon contents vaporize and create the oil and gas combination that rises up out of the retort. The shale residue, continues down the retort, where it is now used to pre-heat a second supply of the collected gas (known as the recycled gas) that is moving up into the retorting zone. This cools the shale as it heats the gas, and the shale residue can then be collected and moved away. By using this form of heat transfer during the process a relatively high thermal efficiency can be achieved, and the retort can produce about 90% of the original oil in the shale, as well as a secondary volume of gas, beyond that needed to energize the retort. The retort has been shown able to handle shale particles ranging in size from 0.25-inch to 3-inch. By design it is possible to make sure that the oil mist that is the major product does not condense onto the shale particles that are being fed into the retort. You may note that this separation process does not require any additional external fuel, nor the addition of water to the process.

Using a slightly different method Union Oil Company ran a demonstration plant that ran at rates up to 1200 tons/day, using oil shale from the Piceance Basin. The crude produced was "a waxy, intermediate gravity, high nitrogen and intermediate sulfur crude" where the wax was removed and separately cracked, and the sulfur and nitrogen levels lowered before it could be considered a "commercial shale oil" with properties similar to that of a high quality Utah crude. A feed of crude shale oil at 26,900 b/d would yield 25,000 bd of commercial shale oil, and 500 t of green coke. The oil could then be cracked into 380 bd of lpg; 13,635 bd of gasoline; 1,300 bd of stove oil; 6,700 bd of diesel and 590 bd of fuel oil.

As I said at the beginning of the post, there is an awful lot of oil shale in the United States, the beds can reach up to 2,000 ft thick, and the oil content can reach 90 gallons/ton. Unfortunately these do not occur at the same time. Rather the highest grade is found in relatively narrow layers in the Uinta Basin, although the oil-shale sequence in the area can be up to 1,200 ft. And unfortunately not all the oil in the shale is made up of the same material, or has the same sort of properties. This can lead both to difficulties in mining and in retorting.

I will discuss those, and the issue of in-situ retorting, and some of its problems in the next post. But, given what happened, it is perhaps appropriate to close this first post with a comment by Harold Carver of Union at the first symposium.
It should be quite obvious that if imports to the coastal states and from Canada suddenly increase disproportionately after a shale industry is started, the embryo shale industry would be placed in a severe competitive bind. Unlimited cheap foreign crude imports would make shale oil as well as a large percentage of domestic crude oil production non-competitive. What is needed is assurance that shale oil production will face a stable economic environment in which it can share in the spectrum of raw materials for our future energy needs.

Given what happened later that was quite visionary.

Read more!