Tuesday, November 9, 2010

The BP Deepwater Horizon Oil Spill and Offshore Drilling Commission

Courtesy of MoonofA, I am able to tell you that this past weekend the final act in the closing of the Deepwater Horizon well was the placing of a steel cap on top of the well, after the top plugs had been put in place, and the well was ready to be abandoned.



And on Monday the Oil Spill Commission began two days of public hearings.

As part of this, the Oil Spill Commission has issued its preliminary conclusions which are:
• Flow path was exclusively through shoe track and up through casing.
• Cement (potentially contaminated or displaced by other materials) in shoe track and in some portion of annular space failed to isolate hydrocarbons.
• Pre-job laboratory data should have prompted redesign of cement slurry.
• Cement evaluation tools might have identified cementing failure, but most operators would not have run tools at that time. They would have relied on the negative pressure test.
• Negative pressure test repeatedly showed that primary cement job had not isolated hydrocarbons.
• Despite those results, BP and TO personnel treated negative pressure test as a complete success.
• BP’s temporary abandonment procedures introduced additional risk.
• Number of simultaneous activities and nature of flow monitoring equipment made kick detection more difficult during riser displacement.
• Nevertheless, kick indications were clear enough that if observed would have allowed the rig crew to have responded earlier.
• Once the rig crew recognized the influx, there were several options that might have prevented or delayed the explosion and/or shut in the well.
• Diverting overboard might have prevented or delayed the explosion. Triggering the EDS prior to the explosion might have shut in the well and limited the impact of any explosion and/or the blowout.
• Technical conclusions regarding BOP should await results of forensic BOP examination and testing.
• No evidence at this time to suggest that there was a conscious decision to sacrifice safety concerns to save money.

Needless to say these conclusions have not all been met with complete agreement, even the first has been challenged by Halliburton. The report on the test of the cement is revealing:
We asked Halliburton to supply us samples of materials like those actually used at the Macondo well so that we could investigate issues surrounding the cement failure. Halliburton provided us off-the-shelf cement and additive materials used at the Macondo well from their stock. Although these materials did not come from the specific batches used at the Macondo well, they are in all other ways identical in composition to the slurry used there. Chevron agreed as a public service to test the cement slurry on behalf of the Commission. Chevron employs some of the industry’s most respected cement experts, and it maintains a state-of-the art cement testing facility in Houston, Texas. Halliburton agreed that the Chevron lab was highly qualified for this work.

We attach Chevron’s report of its laboratory tests, and we have invited one of its experts to discuss that report with you at the public hearing on November 9.

Chevron’s report states, among other things, that its lab personnel were unable to generate stable foam cement in the laboratory using the materials provided by Halliburton and available design information regarding the slurry used at the Macondo well. Although laboratory foam stability tests cannot replicate field conditions perfectly, these data strongly suggest that the foam cement used at Macondo was unstable. This may have contributed to the blowout.

Halliburton has stated publicly that it tested the Macondo cement before pumping it on April 19th and 20th, and that its tests indicated the cement would be stable. When Chevron informed us of the preliminary results of its tests, we asked Halliburton to give us all of the data from all tests it had run on the Macondo cement slurry.

The documents provided to us by Halliburton show, among other things, that its personnel conducted at least four foam stability tests relevant to the Macondo cement slurry. The first two tests were conducted in February 2010 using different well design parameters and a slightly different slurry recipe than was finally used. Both tests indicated that this foam slurry design was unstable.

Halliburton provided data from one of the two February tests to BP in an email dated March 8, 2010. The data appeared in a technical report along with other information. There is no indication that Halliburton highlighted to BP the significance of the foam stability data or that BP personnel raised any questions about it. There is no indication that Halliburton provided the data from the other February test to BP.

Halliburton conducted two additional foam stability tests in April, this time using the actual recipe and design poured at the Macondo well. We believe that its personnel conducted the first of these two tests on or about April 13, seven days before the blowout. Lab personnel used slightly different lab protocols than they had used in February. Although there are some indications that lab personnel may have conducted this test improperly, it once again indicated that the foam slurry design was unstable. The results of this test were reported internally within Halliburton by at least April 17, though it appears that Halliburton never provided the data to BP.


As was brought out in the hearing, the resulting protocol that was implemented for the abandonment of the well at that time also put additional pressure on the cement.
BP’s temporary abandonment procedures at Macondo could have introduced additional risks, such as putting more pressure on Halliburton Co.’s cement job by removing mud and replacing it with seawater, setting the surface cement plug 3,000 ft deep, or deciding not to run a cement bond log test immediately, he continued. 

“What is of additional concern for us is that the procedures for temporary abandonment were changing up until the very last minute,” said Grimsley. “It is not clear to us why decisions on these procedures were changing in the days before the blowout. You have to make choices on the fly when conditions are changing offshore, but this apparently was not the case here.” There also was no indication that anyone at the rig called to shore in the three hours after the negative pressure test ended and the well blew out and said that test readings were odd, he indicated. 



Bartlit said BP’s decision to halt drilling nearly 2,000 ft short of the well’s original intended depth may have been based on concern that it had to keep mud and cement from leaking into adjacent formations, which could have fractured from unusually high pressure in the well. “They stopped because they were interested in well integrity and safety,” he said. Surprises in the reservoir can cause you to make changes which can affect what happens later. As near as we can tell, talking to experts, BP did the right thing here.”

Halliburton have issued a comment on the testing of the cement.
Halliburton has only recently received and is continuing to review the results, which it believes raises a number of questions. Halliburton is issuing this press release to provide information about the content and its preliminary views regarding Chevron’s cement testing report and the letter.

Halliburton believes that significant differences between its internal cement tests and the Commission’s test results may be due to differences in the cement materials tested. The Commission tested off-the-shelf cement and additives, whereas Halliburton tested the unique blend of cement and additives that existed on the rig at the time Halliburton’s tests were conducted. Halliburton also noted that it has been unable to provide the Commission with cement, additives and water from the rig because it is subject to a Federal Court preservation order but that these materials will soon be released to the Marine Board of Investigation. Halliburton believes further comment on Chevron’s tests is premature and should await careful study and understanding of the tests by Halliburton and other industry experts.

With respect to Halliburton’s internal tests, the letter concludes that “only one of the four tests” showed a stable slurry. Halliburton noted that two of those tests were conducted in February and were preliminary, pilot tests. As noted in the letter, those tests did not include the same slurry mixture and design as that actually used on the Macondo well because final well conditions were not known at that time. Contrary to the letter, however, the slurry tested in February was not “a very similar foam slurry design to the one actually pumped at the Macondo well….” Additionally, there are a number of significant differences in testing parameters, including depth, pressure, temperature and additive changes, between Halliburton’s February tests and two subsequent tests Halliburton conducted in April. Halliburton believes the first test conducted in April is irrelevant because the laboratory did not use the correct amount of cement blend. Furthermore, contrary to the assertion in the letter, BP was made aware of the issues with that test. The second test conducted in April was run on the originally agreed upon slurry formulation, which included eight gallons of retarder per 100 sacks of cement, and showed a stable foam.

BP subsequently instructed Halliburton to increase the amount of retarder in the slurry formulation from eight gallons per 100 sacks of cement to nine gallons per 100 sacks of cement. Tests, including thickening time and compressive strength, were performed on the nine gallon formulation (the cement formulation actually pumped) and were shared with BP before the cementing job had begun. A foam stability test was not conducted on the nine gallon formulation.
Their release concludes:
Well logs and rig personnel confirm that the well was not flowing after the cement job. BP and/or others, following the misinterpreted negative tests conducted after the cement job, proceeded to displace mud in the production casing and riser with lighter seawater, allowing the well to flow. Given these numerous intervening causes, Halliburton does not believe that the foam cement design used on the Macondo well was the cause of the incident.

The Commission web site has some beautifully rendered animations of the drilling process, among others. However, apart from taking over an hour for me to download, the drilling animation, among other things, shows the drilling bits creating holes larger than they are, and at the same size beyond the cased section as the well had before the casing was inserted. This does not happen, the well continues at the bit diameter, which is itself smaller than the internal diameter of the casing inserted into the hole over the interval.

And one other note, it appears that even though the moratorium on drilling has been lifted, no permits are available.
Ensco Offshore claims that since the ban was lifted Oct. 12, the government has not issued a single permit that would allow the resumption of any previously suspended drilling activities.

The government doesn't seem to dispute that allegation, saying in a late Monday filing that it must ensure applications meet regulations toughened after the Gulf of Mexico oil spill.


Read more!

Thursday, July 15, 2010

Deepwater Oil Spill - results as the testing begins

The picture that everyone has long been waiting to see became available after 3:25 pm (Eastern) this afternoon, when BP closed the choke lines on the 3-ram stack, and oil stopped flowing into the Gulf.


The process started on Wednesday evening , after a delay during which the Admiral gave permission for the process to start, and held the press conference that I reported on yesterday.

It was followed by the Kent Wells conference, which had been delayed, in which he noted that the relief well had finished a gyro survey to locate its position, and prepared the site for the casing to be set this weekend. Then the drill pipe etc was pulled back into the casing while the integrity test was run. It was left in the well so that, in case there was any passage created between the two wells during the test (they are only just over four feet apart) then heavy mud could be immediately pumped down the RW to kill the risk of any additional problems. (The drill has 30 ft to go to reach the casing point, but is at the desired 2 degree angle).

One of the changes to the plan from that originally conceived was to add four ROVs that would be stationed around the well to alleviate the fears of those who had become worried by the continuing plethora of stories of a breached well casing. Although many of these stories have been discussed, and their invalidity shown, nevertheless in order to keep everyone happy, particularly those with political prominence) four ROVs were set around the well to watch the seabed and ensure there were no leaks.

This is one example of the results – the seabed is stable, with no oil and gas bubbling up from non-existent leaks. (BOA ROV 2)

Had there been any leakage from the well it would likely have come up around the casing of the well at the bottom. Here is the shot (BOA ROV 1) of the mud-line of the well. (The point where the well breaks through the mud to the sea bed).

As you can see, there is none. (The well casing with the BOP above it are just to the right of the lights of the illuminating ROV)

The other change that Secretary Chu apparently imposed was that there be a conference every six hours during the test (which is scheduled to run 48 hours).

The initial plan was to close the rams sealing the well (which happened before I wrote the post yesterday) and then to close the kill line (the two ports that produced the vertical jets I showed last evening) and then to slowly (over a few minutes) close the choke, monitoring the pressure, until the flow ceased.

There should also be a little clarity in the discussion at this point. There are two sets of valves and circuits involved in this process. The first of these are the circuits on the original blowout preventer (BOP) . The kill and choke lines attached to those circuits were modified so that oil and gas are fed through them to the vessels on the surface which are either collecting or burning off the fuel. The second set of kill and choke valves are on the new stack that was mounted above the BOP, and it is these new valves that are being opened and closed. When the stack valves are open the oil flows out into the water, rather than into directed lines, and so they are not the same circuits. At the beginning of the test the BOP valves were closed, so that all the flow went up to the stack where it can flow out through either the drill pipe at the top, the kill lines to the side, or the choke line – which is the curved yellow pipe at the top of the well. The drill pipe flow was first closed, using the central ram in the stack.

As the test began (and as Kent Wells noted in the morning briefing today) there was a leak.
we noticed a leak on a hub on the choke line. And so when we saw that, that would have precluded us from properly doing the test we needed to get that fixed. Fortunately, as everything, we always plan so we had a second choke on surface. So we disconnected that choke and hub system. Took it up, brought the other one down, landed it this morning and we’re once again going through the process of positioning ourselves to do the well integrity tests.
There were in fact two trips to the surface before the choke line was fully in place.

The well was then ready to ramp up for the test, and this was the schedule that Kent Wells reported in the afternoon briefing today
At 10:30 this morning we closed the kill line and since we had already had the middle ram of the capping stack closed that meant the only flow at that point was going out through the choke line and what was also being collected through the Q4000 and the helix producer.

Then between 10:30 and 12:30 we shut down the Q4000, we shut down the helix producer and that meant only flow was going up through the choke line and then at 12:30 we started to close the choke, we would do it a half a turn at a time to just slowly start to close the well in.

And at about 1:15 this afternoon we issued that the integrity test was starting. The official time of the choke being fully closed, which meant the well was fully shut in is approximately 2:25 this afternoon and as of that time there is no flow of oil going into the gulf of Mexico. So obviously this is an encouraging point of time. Remember this is the start of our test.

So the well is currently shut-in, though the results have not been all that had been hoped for. Admiral Allen has already issued a terse comment:
"We're encouraged by this development, but this isn't over. Over the next several hours we will continue to collect data and work with the federal science team to analyze this information and perform additional seismic mapping runs in the hopes of gaining a better understanding on the condition of the well bore and options for temporary shut in of the well during a hurricane. It remains likely that we will return to the containment process using this new stacking cap connected to the risers to attempt to collect up to 80,000 barrels of oil per day until the relief well is completed."
Part of the problem, apparently, is that the well pressure has not reached the 8 - 9,000 psi level that it was hoped it would reach, but instead it is reported to have fallen slightly shy of 7,000 psi. While this is below the expectation, it is higher than the 6,000 psi that Admiral Allen had set as the target below which they would assume a loss in integrity, and restart the flow of oil to the surface vessels.

To try and add a little context to this, at the beginning of the leak the pressure of the oil and gas in the rock at the bottom of the well was measured at 11,900 psi. When the oil and gas fill the well that fluid column has a certain weight that balances some of the rock pressure, and the difference should be the pressure at the top of the column (which is where the BOP and stack sit). That gives the 8 – 9,000 psi range.

If the well pressure at the BOP is measured, however, at just shy of 7,000 psi then there are two possibilities. The first is that there has been so much flow of fluid out of the well that the driving pressure of the fluid in the rock has fallen by the 1,500 psi or so that brings the pressures down to those seen.

While that is a possibility, it may be unlikely because, at the time that the Top Kill was tried and as the Admiral noted just the other day, the well pressure could not be raised above 6,000 psi as they pumped in mud, even though at one stage they stopped the flow of oil out of the well.

What this could indicate is that there is a possibility of crossflow at the bottom of the well. What this means that the oil and gas that are flowing out of the reservoir into the bottom of the well, are, under the pressure in the well, now flowing into a higher reservoir of rock, now that they can't get out of the well. Depending on where that re-injection flow is this may, or may not, suggest that the casing has lost integrity. This is a topic that has been covered in the comments at The Oil Drum, where fdoleza has noted
Exactly. I believe the flow will be coming out of the bottom sand and going into the upper sand. It would not be a leak, but it would tell them why their pressure data ain't a classical surface buildup. And I sure hope they're modeling temperatures and so on, because this is a very interesting case. They don't have downhole gauges, so they'll have to take the way the oil cools down as it sits to get a better idea of the way things are moving down below.

If there are questions whether there is still flow in the formation or from the original formation into surrounding rock, then it is possible that the RW is close enough to the WW that putting a set of very sensitive microphones down the RW might allow some triangulation to estimate where such a flow might be occurring. It might make it easier that the well hasn’t been finally cased yet. But the test has 2 days to run, and will be evaluated every 6 hours. With time some of these questions may be answered as the test continues. (If there is no flow anywhere, after a while all the readings should become quite stable).

Oh, and just as this started to look like a little good news, there is this from the National Hurricane Center:

The windows of opportunity are not likely to remain open long. It is encouraging, however, that there may now be an answer if these do turn into hurricanes.

Read more!

Wednesday, July 14, 2010

Deepwater Oil Spill - starting the testing program

When things are going well down at the Deepwater oil spill site in the Gulf there are press conferences, data flows in a timely manner and the public can understand what is going on. When there are problems, these get delayed. Then as I noted yesterday we become dependant on the videos that BP release, to get a closer and more immediate view of the actual situation. That can at least show the occasional something significant. Today’s such topic is the picture of the well from the Skandi ROV that I took at around 6:15 pm. (though Admiral Allen also had something interesting to note, which I will point to at the end of the post.) And in an update there was a leak on the choke line, so a part (the yellow pipe below) has been removed for repair - the "as is" shot is at the end of the post.

UPDATE The part was repaired and replaced, and at 3:37 pm with the choke line closed, oil stopped flowing from the well into the Gulf.



In his second press conference yesterday, Kent Wells had noted (as I wrote yesterday)
down below two rams there’s a what we call our flow T and there’s two sides to it and that’s where the flow would be coming out when we actually shut one of the rams.
As you may note from the picture the flow has now switched from the top drill pipe section to the two ports below the rams. We can thus presume that the well integrity test is now underway.

That particular flow has now been going on for over 2 hours (the feeds are no longer synchronous with real time) and this was as late a picture as I can currently pull up from the Skandi ROV that showed the picture above:

The two separate flows from the two ports can be discerned still.

So what is going on? Kent Wells tried to explain in his brief this morning. First he ran over the numbers, and then apologized that the schedule that he had anticipated yesterday has fallen behind. Specifically he noted that
The second review that was going on was our team of scientists and industry experts who were once again looking at all the analysis and the procedures – the test procedures that were put in place to make sure that the test was absolutely designed to maximize what we would learn from it and minimize any risk under all possible scenarios. And this test is so important that a decision was taken to give them another 24 hours to make sure that this was the best possible test procedure we could execute. It was just felt that this is so important we wanted to make sure that there was no questions in any minds that we would learn the most from this and we’d minimize risk and so that was the decision that was taken yesterday.
For which, I expect, you can read that Secretary Chu, and his visiting team had a set of questions and discussion points that had to be gone over and reviewed with them, to ensure that they were happy, and would therefore give their thoughtfully considered blessings. They were supposed to have everything settled by the afternoon press conference.
The plan is that at midday today, the team will get back together and a decision will be (maken) – be taken on the path forward. If any amendments need to be made to the test they’ll be made at that point and I’ll certainly let you know at our 2:30 meeting where we stand on that and the path forward.
But what we don’t want to do is move forward with a test that ends up with inconclusive results. And so that’s what the 24 hours is about. We just need to make sure that there’s absolute clarity on this is the right test, this will give us the most information, this will minimize the risk and we can proceed forward and as a result of that then know the best path forward after that, whether it’s to shut in the well, whether it’s to go to containment, what does it mean for the kill with the relief wells. All of those things. We just need to make sure that this is right not – as much as we want to do things as soon as possible, we also want to make sure that they’re done absolutely correct.

But problems apparently persisted as became more obvious this afternoon, as the time for the start of the integrity test (and the explanatory press conference) kept getting put back later and later, until it reached 5 pm when apparently the decision was reached. That transcript is not out yet, but the result was evident with the change in the path of the oil through the stack. There are presently 3 ROVs monitoring the flow (the 2 Skandi ROVs and the BOA ROV 2) and over the course of time the flow out of the ports has changed from the relatively small flow shown above to higher volume flows, and back.

Skandi ROV view showing the higher flow levels from the ports – this is the ROV that is issuing the dispersant in 3 jets from the wand in the picture, at lower flow rates those jets are visible.

The third ROV, the BOA one has moved around so that the lack of flow from the drill pipe is confirmed when the pipe is back-lit from the Skandi ROV that took the first shots above.


In the details of the process that Kent Wells described the process changes include:
I mean the one thing that – and of course I can’t predict exactly how the ROV cameras will be set up but what we will be doing is on the capping stack, we will be opening the two side vents and so there will be – instead of flow just coming out the top, there will be – you’ll start to see flow coming out of the two side vents and then the top gets closed and then one side vent gets closed and then over a period of about a couple hours we close the other choke mechanism. So that would indicate when – that the test has started when we’re shutting down that third event. Whether you’ll get to see all that and figure that, I don’t know. But we’re committed to keeping you posted on where we’re going.

Well the shut-off and diversion of the flow is documented in the pictures above, though it hasn’t been possible to show the switching of the flows, unless this was where the volumes coming from the well and shown by the Skandi ROV changed.

The problem of concern, determining whether, if there is a leak, as indicated by a problem in getting to the 8,000 to 9,000 psi pressure in the well, it is caused at depth or near the surface. As was repeated at this brief
The – in terms of the risk, this is all about as we shut in the pressures, what do the pressures mean. Where – like I say, we don’t know – if we can’t build up pressure, where does that mean the pressure’s being relieved and it can be everything from down very deep to shallower and it was really about trying to understand what do the pressures over time mean, where does that mean the pressures being relieved and it’s one thing to have pressure being relieved deep down. It’s a more difficult situation as it’s being relieved shallow and that’s what we’re just looking at is what do all the pressures mean to make sure we understand exactly what’s going on. And I think I’ve talked about that before, what we want to do is avoid that oil’s being put out in the shallow environment and then there’s always the potential is motive that might be that it could breach up to the surface.

The discussion topics that have led to the delay were further addressed by Admiral Allen at his 4 pm press conference:
We consulted extensively with outside experts from academia. Our science team, led by Secretary of Energy Chu, consulted also with other members of industry regarding of potential issues we should definitely deal with. I will zero right in on what the discussion was mainly about and I’ll be happy to answer some questions about it.



We have never been sanguine or sure that we have known the condition of the wellbore and the casing pipe since the event occurred. As we've gotten closer to having the potential to close in and do pressure readings on the capping stack, we have had numerous discussions about what the current status is of the wellbore and the casing and the implications if they had been damaged or if there was any communication outside the wellbore that might bring oil or hydro carbons into what we call the geological formation potentially to the – to the sub-sea floor.

Some – some questions were raised yesterday about the implications of leakage and how that interfaced with the test as we start to shut down the valves and increase pressure in the capping stack and I'll go over that process in a minute.

What we might expect, what we’re – even low probability, high consequence outcomes.

As a result of that, we asked BP to go back and give us some more information on the structural strength of certain portions of the casing pipes. They had run down there particularly around the 22-inch and 18-inch casing pipes. We asked for some more information about assumptions that could lead to irreversible leakage outside the well from external experts. And we thought about what kind of thresholds we would need to look at as we ran the well integrity test.



That took us about 24 hours to work through all of that. We've had a number of conversations. And early this afternoon, I briefed the president and members of the cabinet on the way forward and at this time will be releasing an order to BP to proceed with the well integrity test, but we gave them some additional direction and we did this to make sure that we were taking due care, and in some cases maybe an over abundance of caution to make sure that we didn't do any irreversible harm to the wellbore as we proceed forward.
Ho noted that the test is being run in 6-hour increments, so that if they started at 17:00 Central, then the second stage should start at 23:00 Central. (about 10 minutes from now as I write).

The stages, as the Admiral reported are:

Here’s how we intend to do the well integrity test. We will slowly take down production from the Q4000 and the helix producer later on today to the point where they are not producing anymore. That will force the oil up through the blowout preventer into the capping stack. At that point, the kill line, the choke line, and the top of the stack will be open, and there’ll be product releasing from there and we know that that's the reason we’ve got the skimmers and the additional capacity on the surface to deal with that.

We will then in sequence close the middle ram here, which will stop the flow out of the top of the stack and then we will take pressure readings.

We will then close the kill line and take pressure readings.

 Following that, we will use a remotely operated vehicle that will hook on to the – that – the little bar here that actually turns a valve, and this choke line has been especially constructed – if you looked at the video, you'll see kind of a yellow object up there with a curved up pipe. That is the choke line. That is the last way for oil to leave the capping stack.

 We will slowly close that, very, very slowly, in partial turns, and measure pressure at the same time. In that manner, we will slowly close the entire capping stack and start the reading pressure.

OK?

 Now, as we do that, we're going to be watching very closely the pressure readings. If the pressure readings stay low, that will tell us that the oil is probably going someplace else and we need to consider the fact we may have a breach in the well bore or in one of the – in one of the casings. If that is the case and we have very low pressure readings for about three hours, we will probably stop at that point. That will be the assumption and we will go into production, bring everything back online so we minimize the amount of oil that's going into the environment and we will assess the results of that test.
At the end of 48 hours, we will stop the test, assess all the information we have. We will probably do another seismic run over the area around the well to detect any potential hydrocarbon or methane leaks from the sea floor. And then we will assess whether or not we need to go into another cycle of closing the capping stack down, taking pressure readings, and this will lead us possibly to two very positive directions. Number one, at some point our ability to determine that we can, with confidence, shut the well in and understand we're not harming the well bore and the casings.
The Admiral did also report on the result of the seismic survey
There’s a seismic test that was done yesterday and we do not have those results until this morning. And what they did was to reinforce the fact there was not a problem where there could have been. And so we had more confidence in the way we’re looking at the alternatives that’s come about.

There was one interesting comment on the top kill operation that is, I believe new
Tell you what – why we’ve been obsessing over this, and (probably) I should have explained a little bit more on the front. We tried the top kill back in May, and we pumped a lot of mud into that well, and as long as we were pumping mud into the well, we were suppressing the oil. But the maximum pressure we were able to achieve pumping the mud down the well bore was only around 6,000 (GSI), so the question is why aren’t we able to achieve a greater pressure head and be successful with the top kill? And you can postulate a number of things, but two we’re discussing, and this was part of the discussion over the last couple of days.



One of them we’re just (pointing) out to the top of the blowout preventer, like we saw the oil escaping. And there was a lot of mud (inaudible) there. The other one was that as it was being forced down, it might be escaping the (as it reached) the casing through the well bore. We don’t know that. The (admission of something) was potentially wrong and we should have this discussion partially due to the fact that we’ve never been comfortable with what the 6,000 psi meant during the top kill effort and what the implication for not being able to achieve a higher pressure.
Now if they couldn’t get the pressure above 6,000 psi then that may be indicative that they were injecting more fluid somewhere in the well, since the reservoir pressure is 11,900 psi. On the other hand if the well stopped the oil flow (which he says it did) then you have to get into how much mud they were able to drive down the column to determine whether they have a problem or not.

It will be interesting to see what the transcript for tomorrow morning's brief brings.


Current status at 10 am Eastern

Read more!

Wednesday, June 23, 2010

Deepwater Oil Spill - Problems with the LMRP cap

BP issued a press release this morning that read:
NEW ORLEANS -- This morning at approximately 8:45 a.m. CDT, a discharge of liquids was observed from a diverter valve on the drill ship Discoverer Enterprise,which is on station at the MC252 well-site. As a precautionary measure,the lower marine riser package (LMRP) containment cap system, attached to the Discover Enterprise, has been moved off the Deepwater Horizon's failed blow-out preventer to ensure the safety of operations and allow the unexpected release of liquids to be analyzed.

Capture of oil and gas through the LMRP cap is therefore temporarily suspended until such time that the cap can be re-installed. Capture of oil and gas through the BOP's choke line to the Q4000 vessel on the surface continues.

LMRP cap floating free 4 pm June 23, 2010 (Enterprise ROV2)

UPDATE: The cap was replaced at around 6:30 pm and appears now to be working as before the event. The standings in the Solar Car race have been added to the end of the post.

Unfortunately the severe weather in the area today is not helping the effort either.
.
Due to severe weather conditions expected across southeast Louisiana today, June 23, regularly scheduled cleanup and response efforts may be impacted/halted as weather systems move through the area. These efforts include controlled burns, dispersant flights, and booming operations. Source efforts and some skimming vessels may be operating as long as conditions do not exceed their operating limits. Protective boom is in place along many miles of Louisiana’s coastline. Crews will resume cleanups as soon as safely possible. Safety of all personnel is important to the success of this operation.
At a press briefing in Washington on the event Admiral Allen blamed the event on an ROV hitting one of the valves on the vent at the top of the cap and causing it to close. With the vent closed the pressure under the cap would increase (since the flow would have a smaller area to escape through). That increase in pressure was enough to reverse the flow through one of the lines that send warm water down to the cap to keep it warm enough that hydrates don’t form.

It appears, from Joel Achenbach's Washington Post report that oil and gas was found coming out of a line that was pumping the water down, which raises a little question over the flow circuit being used that would allow that to happen? That discovery led to the cap being removed from the well for inspection. Any gas outlet at the surface would pose increased risk to those running the operation and had to be dealt with immediately.

The current plan is to replace the cap later this afternoon, presuming that the blockage has been removed. Unfortunately, without the pressure gage recordings from inside the cap it is not possible to know if the pressure build-up was gradual, which could be explained by this deposition of material in the flow path, or if it was a step-function which would more likely result if an ROV had nudged a valve closed.

As I mentioned earlier the alternate hypothesis is that there has been some crystal growth within the flow path through the cap, which caused crystals to grow, constricting the channel and thus raising the pressure in the cap itself. The pressure jump cannot have been too rapid if the indication of the problem came from the backup of oil and gas out of a water line. And crystals can form either quickly, in large size, or more slowly and insidiously.

Barium Sulfate Crystals growing in a 3-inch I.D. pipe that carried oil from the deposits under the North Sea. (Scale is in cm) (Growths of this size can occur in less than 24 hours).

That having been said, and recognizing that Occam’s Razor may well cut my hypothetical throat one of these days, the transcript of the press conference is now available. The Admiral clearly blames the ROV for the incident
Out of abundance of caution the Discover Enterprise removed the containment cap with the riser pipe and moved away until they could assess the condition.

They have indicated that the problem was a Remotely Operated Vehicle that had been around the (inaudible) package that bumped into one of those vents that allows the excess oil to come out. They actually closed it thereby creating pressure and the backflow potentially off the water vent.

They are checking the containment cap right now that there are no hydrates in the containment cap. They will attempt to reinstall the containment cap and begin producing later on today. If there are hydrates they will probably have to rerun the pipeline, and that will take a considerable amount longer.
At present it appears that they are lowering the cap back into position. The specific event was described as follows:
My understanding was they noticed there was some kind of a burp in the line where there was either natural gas or some reason. They thought they had product—or hydrocarbons coming up through the water line that's usually meant to carry hot water down, which is to heat the pipe, as you know to do away with the hydrate problem.

When they thought that that line might have been compromised, or they have the chance that they might have hydrocarbons coming up through that vent into the Discover Enterprise, which is flaring right now, over an abundance of caution they elected to remove the cap and move the riser pipe and the cap away.

When they moved it away then it's open to seawater. And they said if there is any product there you have the chance for hydrates to form. So before they decide to move it back in they have to check and see if there are any hydrates there. If there are hydrates they are probably going to have to pull the drill pipe and reinsert it once the hydrates are cleared.

And again, the initial indications were that one of the vents, which is allowing the oil to vent so the cap will stay on will somehow might have been dislodged by coming in contact with our ROV. But I think they are trying to validate that right now. They do know that one of the vents was shut when they set the second ROV down to take a look. That's all we have right now. We're continuing to look into it.

But then there was also this
they found this out after the fact when they set their ROV down after they had removed the containment cap that it appeared that one of the vents had been closed. Now the assumption is that was a result of an ROV bumping into it and actually closing the vent. We don't know that for sure. I think we're still developing the facts associated with it. I don't think it's any problem in putting on an exact timeline when we get all that stuff together.

The Admiral also updated the schedule for drawing oil from the BOP through the kill line. The riser to carry that has been installed, and they are now hoping to have that hooked up to a second vessel by next Tuesday. This will increase the production capacity from the well to 53,000 bd.

Given the concern that has been expressed about hazardous vapors being given off over the clean-up site, the Admiral also brought an OSHA representative to the meeting, and he noted:
We have been taking samples again, of worker chemical exposures. Again, on the beaches, in the swamps, on the boats, everywhere that workers are. And I will just let you know, we can discuss this a little more, that we have found no exposure levels to any chemicals that are of any concern.

The main problem we've been seeing down there, the main concern that we've had for worker health and safety has to do with heat. As you know, people are working in very high heat conditions. Very often they are also working with Tyvek suits with chemical protective suits, gloves, which exacerbates the heat problem.

Finally there was this interesting teaser about the possibility of running the production from the well to an existing platform.
I believe BP is in discussion with other industry producers that have rigs in the area that might be useful for that. I don't think they concluded those yet. I just mentioned it yesterday because I was asked about whether or not there were any redundancies or any recourse if we had a hurricane or heavy weather that allowed us to move—or required us to move all of the vessels from the scene.

This would be one way if you are actually connected to another drill site, you would not have to rely on service vessels.
There is more on what would be involved at Upstreamonline (who asked the question).

The update on the solar car race, with the teams resting in Rolla overnight, and leaving at 9 am in the morning:

1) Michigan . . . . .15:48 (hours and minutes)
2) Minnesota . . .17:06
3) Bochum . . . . . 17:28
4) Calgary . . . . . .19:08
5) Stanford . . . . . 19:23
6) Missouri S&T 19:47
7) Kaohslung . . . 22:01
8) New Paltz . . . 25:27
9) Northwestern 27:43
10) Kentucky 28:05

And as I drove home from work car #5 the entry from Illinois State, rolled past me and on to the finish line.


Read more!

Thursday, June 3, 2010

Deepwater Oil Spill - capping the riser - Part 1

The vertical section of the riser was cut, using a Shear at 9 am this morning.

Lower Riser Assembly (LRA) atop the Blowout Preventer (BOP) at the Deepwater Horizon well, with the bent riser removed, waiting for the arrival of the Lower Marine Riser package (LMRP) The oil and gas are rising vertically, from the top of the riser, the drill pipe (DP) and the saw cut in the side of the riser (just down from the top of the shear).

At 8:30 pm the ROVs maneuvered the latest version of the “top hat”, variation 7, of the LMRP over the top of the LRA. As the new cap was lowered into place it was surrounded by clouds of oil and gas, making the actual progress of the event somewhat difficult to follow. The new variation had been finished yesterday, to accommodate the changing upper surface of the remnants of the well.

Building LMRP 7 on June 2nd at Port Fourchon (BP )

The Lower Marine Riser Package (LMRP) was first connected to the riser, an to a methanol feed that would help, between them, to inhibit the formation of methane hydrides when the gas came into contact with the surrounding cold seawater. It was then slowly lowered to the site. (You can see the seal, referred to later, along the bottom edge - h/t KLR).

Interior of the LMRP as it was lowered. (KLR)

Once it reached the right depth it was moved across into the fountain of oil and gas, and down over the top of the riser.

Lowering the LMRP into the cloud of oil from the riser.

The initial attempt halted after a while, and by 9 pm the situation was, for while static. The cap was sitting apparently on the rubber seal that had been designed to fit between the LMRP and the flange, but the amount of oil that was leaking out of the bottom of the LMRP, was still a considerable amount, even though some of the flow was also being bypassed through ports on the LMRP that could later be closed.

Flow through a relief port on side off the LMRP to relieve the pressure within it.

Leakage around the seal between LMRP 7 (yellow), the seal (greenish black) and the LRA. (white)

The question now arises as to whether the LMRP could be lowered sufficiently that it could seal to the flange surface, since it was no longer possible to get the seal needed on the upper surface of the riser, given that it had been distorted by the Shear which had cut the bent riser away.

There was a pause, while the engineers had a bit think for over an hour. Looking at the cloud of oil coming out, it does contain small white specs that could be either methane hydrates or drops of the dispersant. And now, at 10:30 pm, there is a little more action.

Oil and gas coming out from under the LMRP

Leaks under the LMRP at 10:30 pm

For those who may not remember, this was the initial plan as it was proposed.

The Lower Marine Riser Package (LMRP) option

So far it is not quite as simple as the sketch would suggest. But I will put this up, and then update, as changes appear. But we may be in for a bit of a wait as they may only slowly close the valves and direct the flow to the surface, as they did with the first oil capture at the RIT. They will be checking slowly through the process to see that as little as possible goes wrong, as they ramp up the flow, and slowly turn off the bypass valves.